My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.03.23 WS Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.03.23 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2021 1:27:26 PM
Creation date
4/24/2021 12:55:37 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEW <br />BRIGHTON <br />building tomorrow today <br />REQUEST FOR COUNCIL CONSIDERATION <br />Agenda Section: Worksession <br />Report Date: 03/16/2021 <br />Council Meeting Date: 03/23/2021 <br />ITEM DESCRIPTION: Informational Update on the Community Center HVAC Updates <br />DEPARTMENT HEAD'S APPROVAL: Jennifer Fink, Director of Parks and Recreation <br />CITY MANAGER'S APPROVAL: <br />No comments to supplement this report Comments attached <br />In 2019, the New Brighton Community Center had 540,000 visitors. These are people using the fitness <br />facilities, the Eagles Nest, the Ramsey County Library, and meeting spaces. Despite total closure in <br />April and May, and limited uses throughout most of 2020 — attendance still topped 182,000. It is <br />home to City-wide and Community building events such as voting, Senior High School graduation night <br />parties, weddings, funerals and is home to several churches. <br />The New Brighton Community Center was built in 1994 and the current HVAC system was installed in <br />2016. At that time, council implemented a forward thinking UV treatment on two of the rooftop units <br />that service the Eagles Nest, Gym and Fitness Center. The entire system is scheduled to be replaced in <br />2036. <br />At the beginning of the COVID-19 Pandemic, City staff worked with Trane to discuss the ability of our <br />HVAC system to upgrade the filters to a MERV 13. After assisting the City with that, Trane approached <br />the City of New Brighton about the opportunity to perform an Indoor Air Quality Assessment. <br />The Trane Indoor Air Quality Assessment provided concrete guidance based on the overall system <br />performance. The assessment identified areas for improvement to meet industry guidelines and <br />optimize indoor air quality. At the time of the assessment, the transmission of COVID-19 was less <br />known. However, since that time, ventilation and circulation of the air have been identified as major <br />contributors in providing a safe environment for visitors. <br />The assessment and the purchasing of the MERV 13 filters were funded by CARES Act dollars. <br />CDC Recommendations as of February 9, 2021 for HVAC and ventilation mitigation strategies that <br />apply to the New Brighton Community Center: <br />• Increase outdoor air ventilation, using caution in highly polluted areas. <br />• Ensure ventilation systems operate properly and provide acceptable indoor air quality for the <br />current occupancy level for each space. <br />• Increase airflow to occupied spaces when possible. <br />• Turn off any demand -controlled ventilation (DCV) controls that reduce air supply based on <br />
The URL can be used to link to this page
Your browser does not support the video tag.