My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.04.13 CC Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.04.13 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2021 1:25:55 PM
Creation date
4/24/2021 12:56:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
believe the air quality in the community center was bad, she stated these improvements would greatly enhance <br />the air quality. She discussed how it would benefit the NBCC to be bringing more fresh air into the space. Mr. <br />TRANE REP stated when the HVAC units were installed only two areas were covered with UV lights. He <br />explained these improvements would continue to enhance the air quality in the NBCC. <br />Councilmember Allen stated he supported the City investing in its infrastructure and to prepare for the future. <br />He wanted to see the City keeping its tenants, visitors and staff safe. He believed this type of project made a lot <br />of sense and noted federal dollars may be able to assist with these type of improvements, along with future UV <br />bulbs. <br />Mayor Niedfeldt-Thomas stated thanked staff for providing the Council with the CDC guidelines within the <br />staff report. She requested staff break down the expenses further for the Council to define what items were <br />repairs and which were COVID related. <br />Councilmember Abdulle commented he supported the proposed improvements for the NBCC. He thanked <br />staff for bringing this item forward. <br />Fink thanked the Council for their feedback and support. <br />Parks Comprehensive Plan Implementation Strategy Discussion <br />Massopust stated in 2018, the City Council authorized the Parks and Recreation Department to begin work on <br />a new Strategic Comprehensive Plan for the Parks System. The plan took over a year to complete. The process <br />included significant and frequent community engagement opportunities. It was adopted by the City Council in <br />September of 2020 and has been added to the City's 2040 Comprehensive Plan as an amendment. <br />Fink explained the Comprehensive Plan identifies a 10-20 year plan for improvements to local parks and <br />recreation trails, buildings and facilities. This plan is ideally updated every ten years in conjunction with the <br />City's Comprehensive Plan. This plan identifies projects and plans that will happen in a shorter time frame as <br />well as those that may not come to fruition during the duration of this plan. The City Council has stated their <br />goal to begin implementation in part of this plan. In addition, New Brighton residents made clear in a city-wide <br />survey in 2017 that while 9 in 10 residents used the park system, only 1 in 10 were satisfied with them. This <br />information, along with recommendations from the Parks Comprehensive Plan Steering Committee and the <br />Parks, Recreation and Environmental Commission have helped to shape the recommendations for <br />implementation. The emerging themes received by staff from the public had to do with establishing a sense of <br />place, creating places to play, pedestrian/ADA safety and creating desired recreation. Park assessments results <br />were discussed at length. The recommendations from the consultants and staff were reviewed in further detail <br />with the Council and staff requested feedback from the Council on how to proceed. <br />Davitt stated this plan was extremely monumental to her and she was excited to be before the Council again. <br />She then discussed the financing options for implementing the Parks Comprehensive Plan. It was noted the <br />internal options available to the Council include the Parks Non -Fleet Capital Asset Replacement Fund, the <br />Pavement Management Internal Service Fund, the Closed Bond Fund, the Community Reinvestment Fund and <br />the Municipal Development Fund. The external options would include a voter referendum bond, lease revenue <br />bonds with the EDA, or abatement bonds. She described what happens when a TIF District decertifies. She <br />reviewed a potential financing plan that would finance the park projects from for Phase I and II from 2021 <br />through 2034. She noted the financing example includes all items in the plan, but this could be adjusted and <br />refined by the Council over time as the parks are further discussed. She discussed how bonding could be used <br />to cover the cost of projects over the next five or six years and described what the payment would be for these <br />bonds. She reported staff recommends a bond be issued in 2021 and again in 2023 to move the Parks <br />
The URL can be used to link to this page
Your browser does not support the video tag.