My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.05.11 CC Packet_Reduced File Size (Amended 2021.05.14)
NewBrighton
>
Council
>
Packets
>
2021
>
2021.05.11 CC Packet_Reduced File Size (Amended 2021.05.14)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 10:07:08 AM
Creation date
12/29/2021 9:11:16 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6776 Lake Drive NE,Suite 110 <br /> iic5T E. G. RUN a SONS, INC j Lino Lakes,MN,55014 <br /> Phone: (651)361-8200 <br /> 19 1 Fax: (651)361-8701 <br /> f$T <br /> Professional Land Surveyors www.e2rud.com <br /> To: The City of New Brighton <br /> Attn: Dustin Lind <br /> From: Jason Rud <br /> Date: April 30,2021 <br /> Re: Estimate for Construction Staking-Old Highway 8 Improvement Project <br /> E21050 New Brighton, Minnesota <br /> Thank you for the opportunity to provide an estimate for the Old Highway 8 Improvement project. I have <br /> prepared the below anticipated scope of work and pricing based on the plans provided by Kimley Horn <br /> Engineering, which are at 90% completion. <br /> Construction Staking Scope of Work: <br /> Phase 1 -Start June 1, 2021 -Complete July 16, 2021 <br /> • Office setup, computations,project management,scheduling and coordination. <br /> • One time field staking of Catch basin location/offset/cut staking <br /> • One time field staking of Sanitary sewer mainline offset/cut staking <br /> • One time field staking of Sanitary sewer structure location/offset/cut staking <br /> • One time field staking of Curb"bump-out" staking(intersections of 8th Ave/71h Street, 8th Ave/8th <br /> Street) <br /> • One time field staking of Pedestrian curb ramp staking <br /> • One time field staking of Blue tops (top of class 5) *note the typical section for 8th Ave will change from <br /> the 90% plans. New typical section will be 7" of asphalt and 8" of class 5 <br /> Phase 1 Estimated Construction Staking Price:$17,980.00 <br /> Phase 2 -Start July 19, 2021 -Complete October 29, 2021 <br /> • Office setup,computations,project management,scheduling and coordination. <br /> • One time field staking of Catch basin location/offset/cut staking <br /> • One time field staking of Sanitary sewer mainline offset/cut staking <br /> • One time field staking of Sanitary sewer structure location/offset/cut staking <br /> • One time field staking of Curb and gutter/median staking <br /> • One time field staking of Bituminous path staking(east side of Old Highway 8) <br /> • One time field staking of Blue tops (top of subgrade and top of class 5) <br /> • One time field staking of Signal pole locations <br /> • One time field staking of Sidewalk/pedestrian ramp locations <br /> • One time field staking of Street lighting pole locations <br /> Phase 2 Estimated Construction Staking Price:$25,380.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.