My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.06.22 CC Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.06.22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 2:04:56 PM
Creation date
12/29/2021 1:46:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project 21-4, 2021 Sanitary Sewer Lining Project will now include the installation of a structural liner within the <br /> existing sanitary sewer main, which lies directly beneath a large utility duct operated by Lumen. The structural <br /> liner will extend the lifespan of the sanitary sewer in the project area, reduce inflow and infiltration into the <br /> sanitary sewer system, and safeguard the City from costly future excavations which would be needed to make <br /> sanitary sewer repairs. <br /> Costs and Funding: The project will be funded with reimbursement funds from Lumen, fund 702, and <br /> Metropolitan Council grant funding ($50,000). The CIP includes annual allocations of $200,000 for sewer pipe <br /> lining. An estimated cost breakdown is shown below. <br /> Item Estimated Costs <br /> CIPP Lining 5th Street to 7th Street (Lumen) $356,728.00 <br /> *Alternate 1 -CIPP Lining 7t"Street to 10t"Street(City-Fund 702) $182,165.00 <br /> *Alternate 2-Open Cut Sewer Replacement(City-Fund 702) $83,345.00 <br /> *Alternates 1 and 2 are concurrent bid items. If Alternate 2 is chosen,the cost of Alternate 1 will decrease. <br /> • <br /> ddrjrawrity <br /> Craig G. Schlichting, P.E. <br /> Director of Community Assets and Development <br /> Attachments: <br /> Plan Cover Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.