My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.06.22 CC Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.06.22 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 2:04:56 PM
Creation date
12/29/2021 1:46:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mn DOT Agreement No. 1033695 <br /> EXHIBIT B <br /> DETAILED COST ESTIMATE <br /> Minnesota Commercial Railway <br /> 10th Street-New Brighton (Type C) <br /> DOT 463542M (ESTI MATE) <br /> IITEM DESCRIPTION UNIT QTY COST <br /> Siemen's Materail $ 140,514.80 <br /> Siemen's Shop Labor $ 13,480.50 <br /> Siemen's Engineering $ 5,216.00 <br /> Electrical Connections $ 2,664.75 <br /> Freight $ 14,971.80 <br /> Foundations(Forest Lake Contracting) $ 16,000.00 <br /> Total Material & Freight $ 192,847.85 <br /> Signal Labor 3 65 160 $ 31,200.00 <br /> B & B/MOW Labor 4 65 40 $ 20,800.00 <br /> Total Labor $ 52,000.00 <br /> Employers Liability Ins 18.15% $ 9,438.00 <br /> Equipment Rental ***** $ 1,000.00 <br /> Trenching ***** $ 1,300.00 <br /> Directional Boring ***** $ 1,750.00 <br /> Vehicle Usage 3 25 10 $ 750.00 <br /> Total Equip Rental & Ins $ 14,238.00 <br /> Total Above Accounts $ 259,085.85 <br /> Project Estimated Cost $ 259,085.85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.