Laserfiche WebLink
Metropolitan Council Environmental Services Long Lake Interceptor Rehabilitation <br /> EXHIBIT B <br /> LONG LAKE INTERCEPTOR REHABILITATION <br /> MCES PROJECT 808861 <br /> OPINION OF PROBABLE COST - CITY OF NEW BRIGHTON PORTION <br /> 4/28/2021-FOTH <br /> Preliminary construction cost estimate based on draft plan set dated 4/28/2021 <br /> Assumptions: <br /> *New Brighton will provide easements for the work on the south side of I-694 <br /> *No cost contingencies have been included <br /> No. Item Unit Quantity Unit Price Amount <br /> 1 Bioroll LF 110 $5.00 $550 <br /> 2 Wood Mulch Construction Entrance EA 1 $5,000.00 $5,000 <br /> 3 Traffic Control LS 1 $5,000.00 $5,000 <br /> 4 Site Preparation LS 1 $20,000.00 $20,000 <br /> 5 Interceptor Cleaning LF 275 $45.00 $12,375 <br /> 6 Cleaning Debris Disposal TN 3 $250.00 $750 <br /> 7 CIPP- 18"x 29" Pre-liner LF 275 $25.00 $6,875 <br /> 8 CIPP- 18"x 29"CMP LF 275 $350.00 $96,250 <br /> 9 Point Repair by Chemical Grout EA 4 $2,500.00 $10,000 <br /> 10 Seed Mix 34-181 and Hydraulic Mulch SY 1500 $2.00 $3,000 <br /> 11 Sweeping HR 16 $125.00 $2,000 <br /> 12 Host Pipe Repair Allowance *** 1 $20,000.00 $20,000.00 <br /> 13 Restoration Allowance *** 1 $20,000.00 $20,000 <br /> Subtotal $201,800 <br /> Engineering &Administration 7% $14,126 <br /> Total $215,926 <br />