Laserfiche WebLink
29. A decorative fence shall be introduced along the boulevard separating this development <br /> from the main drive aisle leading to Palmer Drive; coordination to be done with the Public <br /> Safety department. <br /> 30. The developer shall instruct the City's Park's Department as to existing plants which can be <br /> donated to the City prior to demolition, and outline the permitted removal times so the <br /> work may be completed prior to development activities beginning. <br /> 31. Reference monuments shall be placed as may be required by state law. <br /> 32. The final building shall comply with all applicable City of New Brighton multi-housing <br /> ordinances. <br /> 33. The sub-grade parking level shall be renamed to "lower level" or level "-1" to avoid <br /> confusion for emergency response. <br /> 34. Exterior doors shall be numbered in consecutive order in a clockwise manner around the <br /> building starting with the main lobby entry. <br /> 35. If building camera system is installed, the following shall be considered: a. A camera <br /> specifically installed to monitor the mail area and/or area where packages are designated to <br /> be left. b. Cameras at entrances should be of sufficient resolution and set at proper angles <br /> to support individual identification. <br /> 36. Indoor parking spaces shall be numbered from the lowest level up (i.e. lower level spaces <br /> numbered 100— 199, and main level parking spaces numbered 200—299). <br /> 37. Residential units shall be numbered to indicate the floor they are on (i.e. main level units of <br /> which there are none in the 100's, 2nd floor units in the 200's, 3rd floor units in the 300's, <br /> etc.). <br /> 38. The property address shall be displayed on site consistent with City Code. <br /> 39. All construction activities shall adhere to New Brighton City Code restrictions especially as <br /> they relate to parking and hours of work. <br /> 40. Payment of the required park dedication fee shall be made prior to the City signing the final <br /> plat <br /> 41. Payment of sewer and water connection fees shall be paid prior to issuance of the building <br /> permit. <br /> 42. Approval of this Preliminary Planned Residential Development (PRD) shall remain valid for <br /> 90 days following the date of approval. Application for final PRD approval shall be made <br /> prior to expiration of the preliminary approval. <br /> Assistant Director of Community Assets and Development Gozola reviewed the comments staff <br /> received from the public. He commented further on the request and reported staff <br /> recommends approval of the rezoning, along with approval of the PRD and site plan. <br /> Commissioner McQuillan asked if the Krause easement went with the land. Assistant Director <br /> of Community Assets and Development Gozola reported the easement would go with the land. <br /> 4 <br />