My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.10.26 CC Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.10.26 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 3:59:57 PM
Creation date
12/29/2021 3:44:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
extended another 60 days and the matter would come back to the Planning Commission on <br /> October 19, 2021. <br /> Motion by Commissioner Frischman, seconded by Commissioner Nelsen,to table action on <br /> the SUP request for a 30' x 40' garage for the property at 720 McCallum Road directing the <br /> applicant to work with staff to create plans that were complimentary to the existing home. <br /> Approved 6-1 (Commissioner Biedenfeld opposed). <br /> Due to a technical difficulty, Chair Nichols-Matkaiti recessed the meeting at 7:38 p.m. <br /> Chair Nichols-Matkaiti reconvened the meeting at 7:44 p.m. <br /> (B) Special Use Permit Amendment: Request from Global Academy to amend their existing SUP <br /> and site plan to authorize expansion of the current campus to include a new gymnasium to <br /> the south of the existing building at 3000 5th Street NW—PID 30-30-23-23-0044. <br /> Assistant Director of Community Assets and Development Gozola reported Global Academy is <br /> proposing to place a new gymnasium addition on the SW corner of their existing building. The <br /> gym space would include one new office, new bathrooms, and a storage area. Staff provided <br /> further comment on the request and recommended approval of the Special Use Permit <br /> Amendment, based on the findings of fact and subject to the following conditions: <br /> 1. Engineering comments in the 9/13/21 Engineering Memo shall be successfully addressed to <br /> the satisfaction of the City Engineer prior to issuance of a building permit. <br /> 2. The applicant shall be required to correct any lighting problems that are identified following <br /> construction of the new gym. <br /> 3. New locations for the two handicapped stalls being lost shall be identified prior to issuance <br /> of a building permit, and striping for the new stalls shall be completed prior to the <br /> certificate of occupancy being issued for the new addition. <br /> 4. Failure to adhere to these conditions of approval shall be grounds for revocation of the <br /> special use permit amendment by the City Council. <br /> Chair Nichols-Matkaiti opened the Public Hearing at 7:53 p.m. <br /> Dennis Vegan, 4842 Stinson, stated he lived across the street in Columbia Heights. He discussed <br /> how the building his property would be impacted by the proposed large structure. He noted he <br /> has lived in his home since 1985 and his view would be drastically transformed. He suggested <br /> the structure be moved to the other side of the property in order to impact New Brighton <br /> residents and not Columbia Heights residents. He expressed frustration with the fact this new <br /> structure was being added and feared that additional structures would be added in the future. <br /> He commented on how traffic from the school adversely impacts his neighborhood. He stated <br /> he anticipated this project would go forward, but encouraged the Commission to consider if <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.