My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.11.08 WS Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.11.08 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 4:18:09 PM
Creation date
12/29/2021 3:54:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br /> Department: Water <br /> Item: Re-painting 5th Street Storage Tank Reservoir <br /> Year(s): 2021, 2041 —Total Reconditioning <br /> Cost: 2041 —$1,175,000 <br /> 2040 - $125,000 Plans and Specifications <br /> Description: The 1,300,000 gallon ground storage reservoir is located next to the <br /> PGAC Plant. This tower was built in 1961, with maintenance of a complete interior and <br /> exterior blast and repainting in 2002 and 2021. In 2002, This tower was painted and the <br /> coating system was changed from epoxy/urethane to an Ameron PSX 700. This change <br /> in coatings represents about a 20% increase in the coating life and a retained glossy <br /> appearance for 24 years compared to about 12 years for the epoxy/urethane. <br /> Justification: This is scheduled tank maintenance. <br /> f �L�� t <br /> -3., vbv,_ ,%, • <br /> gyp:. .Arivr\''' ociak. *0-"':- Iii-.1".. <br /> +' <br /> A �" ' ' .. <br /> 5th Stree ... , <br /> t ` ‘`"r `t� -�-� e� • <br /> Storage , Ow ` /d,� <br /> Reservoir BRI �w.� ,�� <br /> �i <br /> I .*Ill .., • lio • <br /> •,•• „„1,i,' • , • gii,,,, <br /> ,_ . . <br /> I ,.4 NI. dr 03 <br /> ' �� ,. . �. <br /> 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.