My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.11.08 WS Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.11.08 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 4:18:09 PM
Creation date
12/29/2021 3:54:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br /> Department: Water <br /> Item: Re-painting South Water Tower <br /> Year(s): 2034 <br /> Cost: 2034ā$1,875,000 Construction <br /> 2033 - $125,000 Plans/Specifications/Inspections <br /> Description: The 1,000,000 galloon South Water Tower is located at 660 5th Street SW <br /> was originally constructed in 1975. The South Water Tower is a hydropillar type. The <br /> interior wet surface was over coated in 1991 with the exterior surface over coated in <br /> 1996. In 2009 the entire Tower was re-painted. The coating systems of today are better <br /> quality then when this tank was first painted. It is expected the 2009 paint job will last 25 <br /> years. <br /> Justification: This is scheduled tank maintenance. <br /> ,' .,iā <br /> 4. South Water <br /> Tower <br /> 1 <br /> 11. , , . <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.