My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.11.08 WS Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.11.08 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 4:18:09 PM
Creation date
12/29/2021 3:54:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br /> Department: Water <br /> Item: Street Reconstruction Water System Improvements <br /> Year: 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 <br /> Cost: $277K $524K $2,147K $767K $582K $1,256K $1,987K $361K $2,208K $320K <br /> Year: 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 <br /> Cost: $362K $2,119K $706K $378K $773K $551K $709K $1,106K $3,375K $787K <br /> Year: 2042 2043 2044 2045 2046 <br /> Cost: $505K $1,735K $1,078K $1,116K $572K <br /> Description: This work involves the replacement of watermains in the annual street <br /> reconstruction areas as well as watermain replacement crossing I-35W at County Road D, and <br /> oversizing of watermain in the NE portion of New Brighton. <br /> Justification: The existing watermains in the reconstruction areas are typically 25 to 30 years old <br /> and in need of replacement. The replacement work will be included in the reconstruction project <br /> contract and the work will be done before the street is repaved. This way the City will save money <br /> in not having to pay for street patching to restore the road at a later date. <br /> I T <br /> litga4e1 ,. i <br /> � j. <br /> t <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.