My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021.11.08 WS Packet
NewBrighton
>
Council
>
Packets
>
2021
>
2021.11.08 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 4:18:09 PM
Creation date
12/29/2021 3:54:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PROJECTS <br /> Department: Storm Sewer <br /> Item: Corrugated Metal Pipe (Citywide) <br /> Year(s): Annual replacements <br /> Cost: $20,000/year <br /> Description: This item includes cost to remove corrugated metal pipe to install RCP storm sewer at <br /> various locations within the City. <br /> Justification: The life cycle of corrugated metal pipe can be as long as 35 years before perforation <br /> of the metal occurs. New CMP includes coatings to extend the life of the pipe. New Brighton has <br /> elected to replace CMP pipe throughout the City with RCP or an approved alternate at various <br /> locations in the City. When reconstructing streets with CMP replacement will be included, but this <br /> item is intended to target pipe outside of the street reconstruction project. <br /> 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.