Laserfiche WebLink
  <br />REQUEST FOR CITY COUNCIL CONSIDERATION  <br />ITEM DESCRIPTION: CONSIDERATION OF APPROVAL OF PLANS AND SPECIFICATIONS AND  <br />AUTHORIZATION TO ADVERTISE FOR BIDS FOR CITY PROJECT 21‐8, HANSEN PARK WATER MAIN  <br />REPLACEMENT  <br />DEPARTMENT HEAD’S APPROVAL: Craig Schlichting, Director of Community Assets and  <br />Development  <br />CITY MANAGER APPROVAL:  <br />No comments to supplement this report _______              Comments attached ______  <br />Recommendation:  Approve the plans and specifications for City Project 21‐8, Hansen Park Water Main  <br />Replacement, and authorize staff to advertise for bids.  <br />  <br />Legislative History: The City hired Short Elliott Hendrickson Inc. (SEH®) to complete plans, specifications,  <br />and bidding documents for a 2022‐2023 replacement of the water main crossing Hansen Park.  <br />  <br />July 27, 2021: The City Council authorized the Director of Community Assets and Development to enter  <br />into a professional services agreement with SEH Engineering in the amount of $43,483 to provide design  <br />and bidding services for City Project 21‐8 Hansen Park Water Main Replacement.  <br />  <br />Strategic Priority Alignment:  Sustainable and Reliable Infrastructure   <br />  <br />Explanation:  The purpose of this item is to obtain Council approval of the plans and specifications and  <br />authorization to advertise for public bids for the 2022‐2023 replacement of the water main crossing  <br />Hansen Park. The replacement will include directional drilling of roughly 950 linear feet of water main  <br />and abandoning the old water main in place.  The old water main currently in place is in need of  <br />replacement due to the shifting of the ground surrounding the water main causing sags and high spots  <br />in the welded steel water main.  The estimated cost for this project is $622,000.  <br />  <br />Costs and Funding:  This project, if approved, would be funded from Water Improvement Fund 701.    <br />  <br />___________________________________  <br />Craig Schlichting, P.E.  <br />Director of Community Assets and Development  <br />Attachments:  Hansen Park Water Main Replacement Plans Cover Sheet  <br />Hansen Park Water Main Replacement Advertisement for Bids  <br />AGENDA SECTION: Consent  <br />REPORT DATE:  June 21, 2022  <br />MEETING DATE:  June 28, 2022