My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022.07.26 CC Packet
NewBrighton
>
Council
>
Packets
>
2022
>
2022.07.26 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 11:20:51 AM
Creation date
1/18/2023 10:40:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 11, 2021 <br /> City Council accepted all bids and awarded a contract to the low bidder Douglas‐Kerr <br />Underground, LLC <br /> Authorized the Director of Community Assets and Development to enter into a contract <br />with E.G. Rud & Sons, Inc. for construction surveying and staking services <br /> Authorized the Director of Community Assets and Development to enter into a contract <br />with American Engineering and Testing, Inc. (AET) for construction and material testing <br />services <br />Strategic Priority: Sustainable and Reliable Infrastructure <br />Financial Impact: Total project construction costs can be found on the attached Final Payment <br />Partial Payment 4. <br /> <br />Explanation: This project consisted of the reconstruction of Old Highway 8 and 8th Avenue NW <br />by the removal and replacement of the existing bituminous pavement, the removal and <br />replacement of designated sections of concrete curb and gutter, storm sewer improvements, <br />sanitary sewer improvements, signal system, improved pedestrian facilities, LED lighting, and <br />landscape improvements. <br />Costs and Funding: <br />This project will be funded from a combination of City of New Brighton general taxes, utility <br />improvement funds, MSA funds, TIF, and Ramsey County Funds. Costs associated with the work <br />along Old Highway 8 will be shared by Ramsey County. A breakdown of final project costs is <br />provided below. <br /> <br /> City Share Ramsey County Share <br />Construction Costs $1,338,339.42 $578,408.56 <br /> <br /> <br /> <br /> <br />________________________________________ <br />Craig Schlichting, P.E. <br />Director of Community Assets and Development <br /> <br />Attachments: <br /> Final Payment Partial Payment 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.