Laserfiche WebLink
May 11, 2021  <br /> City Council accepted all bids and awarded a contract to the low bidder Douglas‐Kerr  <br />Underground, LLC  <br /> Authorized the Director of Community Assets and Development to enter into a contract  <br />with E.G. Rud & Sons, Inc. for construction surveying and staking services  <br /> Authorized the Director of Community Assets and Development to enter into a contract  <br />with American Engineering and Testing, Inc. (AET) for construction and material testing  <br />services  <br />Strategic Priority:  Sustainable and Reliable Infrastructure  <br />Financial Impact:  Total project construction costs can be found on the attached Final Payment  <br />Partial Payment 4.   <br />  <br />Explanation: This project consisted of the reconstruction of Old Highway 8 and 8th Avenue NW  <br />by the removal and replacement of the existing bituminous pavement, the removal and  <br />replacement of designated sections of concrete curb and gutter, storm sewer improvements,  <br />sanitary sewer improvements, signal system, improved pedestrian facilities, LED lighting, and  <br />landscape improvements.  <br />Costs and Funding:  <br />This project will be funded from a combination of City of New Brighton general taxes, utility  <br />improvement funds, MSA funds, TIF, and Ramsey County Funds. Costs associated with the work  <br />along Old Highway 8 will be shared by Ramsey County. A breakdown of final project costs is  <br />provided below.   <br />  <br />      City Share  Ramsey County Share  <br />Construction Costs    $1,338,339.42  $578,408.56  <br />  <br />  <br />  <br />  <br />________________________________________  <br />Craig Schlichting, P.E.  <br />Director of Community Assets and Development  <br />  <br />Attachments:  <br /> Final Payment Partial Payment 4  <br />  <br /> <br />