Laserfiche WebLink
Function:ADMINISTRATION <br />Dept Project Name Justification Useful Life <br />City of New Brighton <br />Capital Improvement Plan <br />2023 thru 2032 <br />Asset Details <br />Info Tech Printer Replacements #50096 <br />The City budgets annually for replacement printers.  The funding is not utilized  <br />unless one of the existing printers is not repairable and must be replaced. <br />1 <br />SAN 60% <br />The City budgets for replacement of the Storage Area Network every five  <br />years. 60% of this is allocated to the general fund, and 40% is allocated to  <br />Public Safety for the evidence management system (Arbitrator). <br />5 <br />Server Room Fire Protection The Fire Protections system is designed to detect a fire in the network room  <br />and activate a chemical that will put out the fire and not damage the network  <br />equipment. <br />10 <br />Server Room Front Cooling  <br />System Two A/C cooling units keep the network room in the Public Safety Center from  <br />over heating.  Given the size of the two units maintenance and replacement  <br />parts will be the primary long term cost going forward. <br />10 <br />Server Room Rear Cooling  <br />System Two A/C cooling units keep the network room in the Public Safety Center from  <br />over heating.  Given the size of the two units maintenance and replacement  <br />parts will be the primary long term cost going forward. <br />10 <br />Server room UPS ‐ Batteries The server room UPS system requires regular battery replacements.5 <br />Upgrade Web‐site <br />This communication medium allows staff to post and keep the City residents  <br />informed and provides quick access to the City resources such as contact  <br />information and documents needed to conduct business with or around the  <br />City of New Brighton. Web site review will happen every 4 to 5 years  <br />5 <br />DRAFT32