My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022.08.23 WS Packet
NewBrighton
>
Council
>
Packets
>
2022
>
2022.08.23 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2023 11:20:51 AM
Creation date
1/18/2023 10:52:30 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Function:ADMINISTRATION <br />Dept Project Name Justification Useful Life <br />City of New Brighton <br />Capital Improvement Plan <br />2023 thru 2032 <br />Asset Details <br />Info Tech Printer Replacements #50096 <br />The City budgets annually for replacement printers. The funding is not utilized <br />unless one of the existing printers is not repairable and must be replaced. <br />1 <br />SAN 60% <br />The City budgets for replacement of the Storage Area Network every five <br />years. 60% of this is allocated to the general fund, and 40% is allocated to <br />Public Safety for the evidence management system (Arbitrator). <br />5 <br />Server Room Fire Protection The Fire Protections system is designed to detect a fire in the network room <br />and activate a chemical that will put out the fire and not damage the network <br />equipment. <br />10 <br />Server Room Front Cooling <br />System Two A/C cooling units keep the network room in the Public Safety Center from <br />over heating. Given the size of the two units maintenance and replacement <br />parts will be the primary long term cost going forward. <br />10 <br />Server Room Rear Cooling <br />System Two A/C cooling units keep the network room in the Public Safety Center from <br />over heating. Given the size of the two units maintenance and replacement <br />parts will be the primary long term cost going forward. <br />10 <br />Server room UPS ‐ Batteries The server room UPS system requires regular battery replacements.5 <br />Upgrade Web‐site <br />This communication medium allows staff to post and keep the City residents <br />informed and provides quick access to the City resources such as contact <br />information and documents needed to conduct business with or around the <br />City of New Brighton. Web site review will happen every 4 to 5 years <br />5 <br />DRAFT32
The URL can be used to link to this page
Your browser does not support the video tag.