My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 02-14-2006 (2)
NewBrighton
>
Council
>
Packets
>
2006
>
CCP 02-14-2006 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2006 2:47:19 PM
Creation date
2/10/2006 1:05:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />FEB-07-2006 13;51 <br />02/07/2006 13:50 FAX 952 466 BRRR ENGINEERING <br />5525 WICKENRAUSBR BIC <br /> <br />. <br /> <br />. <br /> <br />I <br />~ <br /> <br />9528322601 P.06/07 <br />@006 <br /> <br />J~-2~>-2006 16:44 BARR Et-UIHEERING <br />01/25/2006 16:J3 FAX A52 466 5525 WICKENHAUSER E!e <br />63,242$7187 TwELL. 11'11; <br /> <br />~528322601 P.02/03 <br />~ooz <br />PAGE 21~ <br /> <br /> <br />lWEll Environmental. Inc, <br /> <br />ENVIRONMENTAL & CONSTRUCTION SERVICES <br /> <br />January 25, 2006 <br /> <br />Wi~kenbauscr Exca:vating. Inc. <br />Attn: JoW1fie Wickenhauser <br />350 Villa Drive <br />Cologne, MN. 55322 <br /> <br />De9f Joannge, <br /> <br />Thank. you for the opportwrl1-y to prov~d~ you with a proposal for <br />remO\'W ofubestos and stabilization of lead paint for 1300 Old Hwy <br />8. <br /> <br />Our proposallncludc!3 all labor, ltIaterials. equlptxient, air mo~j.toring <br />and disposal required. to paform tbe worlc accorol.ng to all regulations <br />in etfed on this date. Also included life all costs for permits, fees.. <br />insurance, (rtc. <br /> <br />Our proposal includes 1he following: <br />. Removal of asbestos cout.a1nmg materials as noted in tb~ <br />Environmental SllI'lcl:Y Report prepared by AES date;d 10/1 0/05 <br />List of asbestos ma.tt:rials to be rtnlove<.l- tile, :mastic (to allow <br />concrete to be rccycled)1 1lte doors. piping insulation. adhesives, <br />ell'terior penetration filler. etectricaJ panels coot.aining asbestos> <br />and blllCk tar abOve the garage door. <br /> <br />Assumptions I Excll,1$,iQDS: <br />. H~dous 1 Special wwrte is not inclllded in our proposal, <br />. ft.-sbestO$ xnnteri:;:l~S that way be preSelIt under con<:re\e slabs. and <br />in.'Jide wal~ arc; not inoluded in our propo=,al. <br />. Stabiliwion and disposal of peeliag Lead Paint not required. sil'lce <br />all PaUlt is in good IXlnditiotJ,. <br />. Worlc to be completed Monday - Friday during normal business <br />hours. <br /> <br />OIU' total proposal for the work noted abov~ is $:29. 422,00 (Twenty <br />Nine thousand Four Hunib:ed Twel\ty Two doUsrs and no cents). <br /> <br />"78th AVllnue I'IIOI't'" Brooklyn P(l(k, f\IIN 55443 . phonll (763) 56&-6900' Fax (7S!!} 56~~903' wWw,tWl!U!!rw.~Qm <br />
The URL can be used to link to this page
Your browser does not support the video tag.