My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.01.04 EDC Packet
NewBrighton
>
Commissions
>
EDC
>
EDC Packets
>
2023
>
2023.01.04 EDC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 2:06:33 PM
Creation date
12/26/2023 4:21:23 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Banner Timeline <br /> <br />In the coming weeks, the City will learn more about the parameters of our new grant and whether <br />there are any applicable deadlines our work plan must incorporate. In the meantime, staff offers the <br />following rough draft approach for project completion. The EDC is asked for your thoughts and <br />feedback this general time line. <br /> <br /> <br />January—Design Brainstorming <br />I. Review the City’s existing banner themes & décor <br />II. EDC brainstorms design ideas, themes, styles, dates of use, etc <br />III. Equity Commission brainstorms design ideas, themes, styles, dates of use, etc <br />IV. Council takes input from both Commissions and identifies the final general concepts to be <br />implemented on the new banners <br />V. Local artists and print shop providers notified of the available work <br /> <br />February—Provider Identification / Draft Design Creation <br />I. Potential artists identified, and final provider selected (process TBD) <br />II. Rough designs created following Council’s guidance on general concepts <br />III. Rough designs presented to Council at a Work Session meeting to identify final direction <br />for banners <br /> <br />March—Final Designs Created <br />I. Final Design creation by selected artist <br /> <br />April—Design Finalization / Production Details <br />I. Work with the Artist / designer/ printer on final design <br />II. Choose final material for banners <br />III. Authorize production once all details are in place <br /> <br />May—Production <br />I. Review Sample Prints prior to final printing run <br />II. Give approval for final printing <br /> <br />June—Grant Close <br />I. Close out grant with Ramsey County following all proper procedures.
The URL can be used to link to this page
Your browser does not support the video tag.