My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.06.20 PC Packet
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2023
>
2023.06.20 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 3:43:40 PM
Creation date
1/2/2024 2:05:26 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />Corporate Office ‐ West: <br />401 8th Avenue SE <br />Cedar Rapids, IA 52403 <br />Telephone: 319.393.4831 <br />Facsimile: 319.393.0324 <br /> <br />Corporate Office – East: <br />480 Duke Drive, Suite 100 <br />Franklin, TN 37067 <br /> <br /> <br /> <br />Regional Locations: <br />Columbus, OH <br /> <br />Cincinnati, OH <br /> <br />Des Moines, IA <br /> <br />Kansas City, MO <br /> <br />Minneapolis, MN <br /> <br />Omaha, NE <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Architectural Design <br /> <br />Real Estate Development <br /> <br />Interior Design <br /> <br />Construction <br />PROJECT NARRATIVE <br /> <br />Apple Tree Dental is remodeling their building at 2201 26th Avenue NW in New <br />Brighton to house their corporate offices, lab, and mobile unit operation. As part <br />of the project, a garage will be constructed on the north end of the existing <br />building for their two mobile unit panel trucks. <br /> <br />With the garage addition and the need for additional staff parking, the north end <br />of the existing parking lot will be modified and expanded toward the north <br />property line while remaining behind the required setback line. Some existing <br />mature pine trees will have to be removed to implement this parking lot <br />expansion so two options are being offered as a way to provide the required <br />screening. <br /> <br />The only changes to the existing building exterior will be the addition of windows <br />on the east side facing the car wash on the adjacent property and the garage <br />addition on the north side. Primus has confirmed that the size and quantity of <br />unprotected window openings shown meets the requirements outlined in the <br />Minnesota building code based on the distance from the building façade to the <br />property line. As shown in the accompanying exterior elevation drawings, the <br />garage addition will utilize some of the same existing materials as the current <br />building.
The URL can be used to link to this page
Your browser does not support the video tag.