My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.09.19 PC Packet
NewBrighton
>
Commissions
>
Planning
>
Planning Commission Packets
>
2023
>
2023.09.19 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 3:43:40 PM
Creation date
1/2/2024 2:24:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Updating Parking and Access Standards <br />Date: 9/12/23 <br />Page: 5 <br /> <br />I:\COMMDEV\Grants and Program Reports\Ramsey County Corridor Revitalization Apps 2022\Parking Standards\05_PROJECT FILES\09-19-23 PC Review\EXT_Parking code prelim <br />updates_covermemo_09142023.docx <br /> <br />stipulate that residential parking must still be provided on-site and that join parking <br />could be served off-site. <br /> <br />III. Discussion <br />As we move towards a final, proposed set of codes we would like to hear your thoughts about the <br />proposed parking regulations and answer the following questions: <br />• Are you comfortable with the proposed uses and reduction of parking stalls? <br />• Are you comfortable with the flexibility provided? <br />• Do you feel modern technologies like EV and modern movement like rideshare and on-demand <br />impacts are adequately addressed? <br />• Does the proposed integration of access and driveway standards meet your expectations? <br />• Do you support the proposed bicycle and pedestrian considerations? <br />• Is there anything missing? Have we addressed your previous comments and needs? <br /> <br />IV. Next Steps <br />The next steps in this project are: <br />• Make any final changes based on Planning Commission and public feedback <br />• Begin drafting a short “best practices” handout or guide outlining the concepts which steered <br />finalization of New Brighton’s updated ordinance (Goal 9) <br />• Begin process of adoption and schedule a public hearing <br />
The URL can be used to link to this page
Your browser does not support the video tag.