City of New Brighton Contractor: Pember Companies, Inc. <br />Department of Community Assets and Development N 4449 469th Street <br />Menomonie, WI 54751 <br />Project 21-11, Robin Lane Traffic Calming Phone: (715) 235-0316 <br />City of New Brighton <br />Partial Payment 3 Final Payment <br />Date: July 21, 2023 <br /> QUANTITY COST <br />QUANTITY <br />THIS <br />PAYMENT <br /> QUANTITY COST <br />1 2021.501 MOBILIZATION LUMP SUM $28,285.00 1 $28,285.00 1 $28,285.00 <br />2 2102.518 PAVEMENT MARKING REMOVAL SQ. FT. $5.85 270 $1,579.50 270 $1,579.50 <br />3 2104.501 REMOVE SEWER PIPE STORM LIN. FT. $30.00 6 $180.00 6 $180.00 <br />4 2104.501 REMOVE CURB AND GUTTER LIN. FT. $5.80 1,116 $6,472.80 1,090 $6,322.00 <br />5 2104.503 REMOVE CONCRETE WALK SQ. FT. $1.25 314 $392.50 314 $392.50 <br />6 2104.504 REMOVE BITUMINOUS PAVEMENT SQ. YD. $8.60 903 $7,765.80 903 $7,765.80 <br />7 2105.505 REMOVE CONCRETE DRIVEWAY PAVEMENT SQ. YD.$14.65 195 $2,856.75 195 $2,856.75 <br />8 2104.509 REMOVE DRAINAGE STRUCTURE EACH $1,100.00 1 $1,100.00 1 $1,100.00 <br />9 2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN. FT. $5.35 190 $1,016.50 190 $1,016.50 <br />10 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN. FT. $3.50 1,102 $3,857.00 1,102 $3,857.00 <br />11 2104.523 SALVAGE CASTING EACH $145.00 1 $145.00 1 $145.00 <br />12 2104.523 SALVAGE SIGN AND POST EACH $55.00 6 $330.00 6 $330.00 <br />13 2104.618 SALVAGE BRICK PAVERS SQ. FT. $13.50 5 $67.50 5 $67.50 <br />14 2105.607 COMMON EXCAVATION CU. YD. $67.00 15 $1,005.00 15 $1,005.00 <br />15 2123.61 STREET SWEEPER (WITH PICKUP BROOM) HOUR $135.00 4 $540.00 4 $540.00 <br />16 2211.509 AGGREGATE BASE CLASS 5 TON $37.00 300 $11,100.00 310 $11,470.00 <br />17 2231.501 WEARING COURSE - SPWEA240B (DRIVEWAY/TRAIL MIX) TON $635.00 6 $3,810.00 6 $3,810.00 <br />18 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GAL. $30.00 12 $360.00 25 $750.00 <br />19 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE SPWEB340C TON $403.00 32 $12,896.00 49.07 $19,775.21 <br />20 2360.502 TYPE SP 12.5 NON WEARING COURSE MIXTURE SPNWB330C TON $517.00 46 $23,782.00 69.86 $36,117.62 <br />21 2502.601 LANDSCAPE/IRRIGATION SYSTEM ALLOWANCE LUMP SUM $2,000.00 1 $2,000.00 <br />22 2503.602 CONNECT TO EXISTING STORM SEWER EACH $1,225.00 1 $1,225.00 1 $1,225.00 <br />23 2504.602 ADJUST VALVE BOX EACH $280.00 1 $280.00 1 $280.00 <br />24 2506.502 CONSTRUCT DRAINAGE STRUCTURE (2'X3') W/ CASTING EACH $4,300.00 1 $4,300.00 1 $4,300.00 <br />25 2506.602 INSTALL SALVAGED CASTING EACH $565.00 1 $565.00 1 $565.00 <br />26 2521.501 4" CONCRETE WALK SQ. FT. $5.85 4,266 $24,956.10 4,637 $27,126.45 <br />27 2521.602 DRILL AND GROUT REIN BAR (EPOXY COATED) EACH $10.10 41 $414.10 41 $414.10 <br />28 2521.618 CONCRETE WALK SQ. FT. $12.20 570 $6,954.00 570 $6,954.00 <br />29 2531.501 6" CONCRETE DRIVEWAY PAVEMENT, HIGH EARLY SQ. YD. $79.45 350 $27,807.50 350 $27,807.50 <br />30 2531.501 CONCRETE CURB & GUTTER (SPOT REPAIR) LIN. FT.$42.25 62 $2,619.50 60 $2,535.00 <br />31 2531.503 CONCRETE CURB & GUTTER DESIGN S412 LIN. FT. $15.80 1,050 $16,590.00 1,091 $17,237.80 <br />32 2531.618 TRUNCATED DOMES SQ. FT. $45.25 44 $1,991.00 48 $2,172.00 <br />33 2540.618 INSTALL SALVAGED BRICK PAVERS SQ. FT. $55.00 5 $275.00 5 $275.00 <br />34 2563.601 TRAFFIC CONTROL LUMP SUM $5,075.00 1 $5,075.00 1 $5,075.00 <br />35 2564.602 INSTALL SALVAGED SIGN AND POST EACH $320.00 6 $1,920.00 6 $1,920.00 <br />36 2573.503 STORM DRAIN INLET PROTECTION EACH $135.00 2 $270.00 2 $270.00 <br />37 2574.507 ORGANIC TOPSOIL BORROW CU. YD. $150.00 30 $4,500.00 20 $3,000.00 <br />38 2575.504 SODDING TYPE LAWN SQ. YD. $30.00 230 $6,900.00 266 $7,980.00 <br />39 2582.518 CROSSWALK MARKING-PAINT (WR)SQ. FT. $13.80 72 $993.60 90 $1,242.00 <br /> $217,177.15 <br />ORIGINAL CONTRACT $217,177.15 <br />Change Order 1 $20,567.08 <br />Partial Payment 1 $155,419.76 Change Order 1 $20,567.08 TOTAL WORK TO DATE $237,744.23 <br />Partial Payment 2 $70,437.26 Less Retainage 0% <br />Partial Payment 3 $11,887.21 Sub-total $237,744.23 <br />Total $237,744.23 Less Previous Payments $225,857.02 <br />PARTIAL PAYMENT 3 FINAL PAYMENT $11,887.21 <br />ITEM <br />NUMBER <br />CONSTRUCTION COST <br />PAYMENT <br />$237,744.23 <br />NO. DESCRIPTION UNIT UNIT PRICE <br />CONTRACT BID <br />N:\ENG\2021 Proj\21-11 Robin Lane Traffic Calming\Payments\PP 3 Final Payment\PP3 Final Payment 1 7/21/2023