My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.09.05 WS Packet
NewBrighton
>
Council
>
Packets
>
2023
>
2023.09.05 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:05:53 PM
Creation date
5/23/2024 8:30:40 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
414
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2024 – 2033 Utility Funds: $33,329,200 ‐ 1,000,000 2,000,000 3,000,000 4,000,000 5,000,000 6,000,0002024•Oakwood Drive & SE Hansen Area $3,053,000•Flood Mitigation $793,0002025•Mounds Avenue & Violet Lane $1,466,000•Forestdale Water Tower Painting $670,0002026•19th& 20thSouth of 7th$1,196,0002027•Between Silver Lk Rd & Long Lk Rd N of 14th$2,237,0002028•14thto 17thEast of Silver Lake Road $3,521,000•Lift Station #1 Pumps and Controls $220,0002029•Innsbruck Area & 17th‐Oakwood $640,0002030•14thto 16thNear E2 $4,623,0002031•Mississippi to Rice Creek Terrace Area $628,000•Old Highway 8 Watermain Upgrade Hwy 96 to MV Border $618,0002032•Mississippi to Rice Creek Road $766,000•Old Hwy 8 Watermain Upgrade Rice Creek to Old Hwy 8 $695,0002033•5th/Driftwood & 3rd/Heritage Area $4,471,000Water ‐$22,282,200 Stormwater‐$6,612,000Sanitary Sewer ‐$4,230,000 Street Lights ‐$205,00026
The URL can be used to link to this page
Your browser does not support the video tag.