Laserfiche WebLink
Sanitary Sewer Capital•Total Projected Costs of CIP to 2043 ‐$7,071,000•2024 –Lift Station #8 Pumps and Controls $216,000 •2024 –Salt Shed Installation $75,000•2026 –SCADA Replacement $150,000•2028 –Lift Station #1 Pumps and Controls $220,000•2036 –Lift Station #23 On‐Site Generator $119,000•2040 –Lift Station #7 Pumps and Controls $386,000•2024‐2043 –Street Reconstruction Costs ~$100,000/year•2025‐2043 – Annual Lining of Problem Sewers $200,000/year