My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.11.14 WS Packet
NewBrighton
>
Council
>
Packets
>
2023
>
2023.11.14 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:05:54 PM
Creation date
5/24/2024 2:39:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sanitary Sewer Capital•Total Projected Costs of CIP to 2043 ‐$7,071,000•2024 –Lift Station #8 Pumps and Controls $216,000 •2024 –Salt Shed Installation $75,000•2026 –SCADA Replacement $150,000•2028 –Lift Station #1 Pumps and Controls $220,000•2036 –Lift Station #23 On‐Site Generator $119,000•2040 –Lift Station #7 Pumps and Controls $386,000•2024‐2043 –Street Reconstruction Costs ~$100,000/year•2025‐2043 – Annual Lining of Problem Sewers $200,000/year
The URL can be used to link to this page
Your browser does not support the video tag.