My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023.11.14 WS Packet
NewBrighton
>
Council
>
Packets
>
2023
>
2023.11.14 WS Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 3:05:54 PM
Creation date
5/24/2024 2:39:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stormwater Capital•Total Projected Costs of CIP to 2043 ‐$16,162,600•2024 Future Flood Mitigation Work•4thStreet Low Area $592,000 •Oakwood Pipe Overflow $170,000•Gardenview$31,000•2024 Salt Shed Installation $75,000•2039 Lions Park Stormwater Re‐Use $302,600•2024‐2043 Pavement Management Plan $1,070,000•2024‐2043 Street Reconstruction Costs $2,163,000•2024‐2043 Curb replacements $7,994,000•2024‐2043 Pond dredging $2,125,000
The URL can be used to link to this page
Your browser does not support the video tag.