Laserfiche WebLink
Stormwater Capital•Total Projected Costs of CIP to 2043 ‐$16,162,600•2024 Future Flood Mitigation Work•4thStreet Low Area $592,000 •Oakwood Pipe Overflow $170,000•Gardenview$31,000•2024 Salt Shed Installation $75,000•2039 Lions Park Stormwater Re‐Use $302,600•2024‐2043 Pavement Management Plan $1,070,000•2024‐2043 Street Reconstruction Costs $2,163,000•2024‐2043 Curb replacements $7,994,000•2024‐2043 Pond dredging $2,125,000