Laserfiche WebLink
PUBLIC WORKS PROJECTS <br /> <br />Department: Water <br /> <br /> <br />Item: Street Reconstruction Water System Improvements <br /> <br />Year: 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 <br />Cost: $2,686K $1,096K $821K $1,835K $3,260K $179K $3,428K $208K $177K $3,237K <br />Year: 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 <br />Cost: $706K $408K $455K $51K $143K $930K $5,431K $206K $1,411K $3,855K <br /> <br />Description: This work involves the replacement of watermains in the annual street <br />reconstruction areas as well as watermain replacement crossing I-35W at County Road D, and <br />oversizing of watermain in the NE portion of New Brighton. <br /> <br />Justification: The existing watermains in the reconstruction areas are typically replaced if we see <br />a high break frequency or there age suggests the need of replacement. At a minimum hydrants and <br />valves are replaced on a more frequent basis to insure they operate when needed and older <br />facilities do not always have available replacement parts. The water replacement work will be <br />included in the reconstruction project contract and the work will be done before the street is <br />repaved. This way the City will save money in not having to pay for street patching to restore the <br />road at a later date. <br /> <br /> <br />24