Laserfiche WebLink
Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected Projected ProjectedDescription2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043Uses:Capital ProjectsPublic Works/Parks Maintenance Building Improvements 850,000Salt Shed Installation75,000SCADA Replacement150,000Future TBD Re‐line Sanitary Sewer Lines‐                ‐               200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000      200,000   200,000    200,000    Sub‐total Sewer Infrastructure 850,000       75,000        200,000   350,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000   200,000      200,000   200,000    200,000    Flood Control Projects:Lift Station #23 On‐Site Generator119,000   Lift Station # 7 Replace Pumps and Controls386,000      Replace lift sation #8, install new pumps & controls216,000      Install new pumps and controls for Lift Station #1220,000   Sub‐total Flood Control‐                216,000      ‐             ‐             ‐            220,000   ‐             ‐             ‐             ‐             ‐             ‐             ‐            119,000   ‐             ‐             ‐            386,000      ‐             ‐              ‐             Annual Street Reconstruction Projects:2021 Sunnyside East Area Street Reconstruction46,326         2022 MSA Routes17,270         2023 Poppyseed Drive Street Reconstruction45,000         2023 West Long Lake Area Street Reconstruction50,000         2024 Oakwood Drive & SE Hansen Area100,000      2025 Mounds Avenue & Violet Lane 100,000   2026 19th/20th S of 7th100,000   2027 Between SLR & LLR North of 14th100,000   2028 14th to 17th of SLR 100,000   2029 Innsbruck Area100,000   2030 14th to 16th near E2100,000   2031 Mississippi to Rice Creek Terrace Area100,000   2032 Mississippi to Rice Creek Road100,000   2033 5th/Driftwood & 3rd/Heritage Area105,000   2034 Bell Pole Area105,000   2035 Torchwood Dr & Pike Lake East Area105,000   2036 SE Streets and Campus Drive Industrial Avenue105,000   2037 Wexford Heights Area110,000   2038 Brookshire Area110,000   2039 1st Streets NW/SW110,000   2040 Tioga/Inca110,000      2041 Fairfield/8th Street110,000   2042 17th/20th/25th/28th110,000    2043 29th/Lake Diane125,000    Sub‐total Street Reconstruction158,596       100,000      100,000   100,000   100,000   100,000   100,000   100,000   100,000   100,000   105,000   105,000   105,000   105,000   110,000   110,000   110,000   110,000      110,000   110,000    125,000    Total Uses1,008,596   391,000      300,000   450,000   300,000   520,000   300,000   300,000   300,000   300,000   305,000   305,000   305,000   424,000   310,000   310,000   310,000   696,000      310,000   310,000    325,000    28