Laserfiche WebLink
PUBLIC WORKS PROJECTS <br /> <br />Department: Sanitary Sewer <br /> <br /> <br />Item: Street Reconstruction Sewer Improvements <br /> <br /> <br />Year: 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 <br />Cost: $100K $100K $100K $100K *$100K $100K $100K $100K $100K $105K <br />Year: 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 <br />Cost: $105K $105K $105K $110K $110K $110K $110K $110K $110K $125K <br /> <br /> <br />Description: The repair or replacement of existing sanitary sewer mains in the street <br />reconstruction areas. This work includes the excavation and repair of sewer mains that cannot be <br />repaired with out digging up the street. <br /> <br /> <br />Justification: Prior to street reconstruction all sanitary sewer mains in the street reconstruction <br />project area are televised and repairs are identified. The repair work is included in the <br />reconstruction project contract and the work is done before the street is repaved. This method <br />saves money in respect to having not to pay for street patching to restore the road at a later time. <br /> <br />Repairing problem sanitary sewers before they cause back-ups saves the City and residents a lot of <br />grief and money. <br /> <br />*2028 will include a gravity sewer line to remove lift station 1 and connect sewer to CR E2 (lift <br />station 23). <br /> <br /> <br /> <br />40