Laserfiche WebLink
Insituform Proposal – New Brighton, MN – bid date 11 20 23 <br /> <br /> Page 2 of 4 <br />3. The Owner is responsible for locating and access to all MHs. <br /> <br />4. The Owner is responsible for restoration. <br /> <br />5. Insituform submits this bid based on the plans and s pecifications furnished to it. Insituform’s <br />bid is expressly conditioned upon the negotiation of terms and conditions fair to Insituform. <br />Insituform shall have no obligation to perform and shall not be bound by its bid until the <br />execution of a mutually agreeable written contract. <br /> <br /> <br />Proposal Inclusions <br /> <br />The prices stated in this proposal include: <br /> <br />1. Mobilization and demobilization. <br />2. Pipeline cleaning of normal deposits any conditions beyond ‘normal” will be treated as an extra <br />3. Pre-Video inspections and documentation of existing pipe prior to reconstruction with the Insituform process <br />for pipe rehabilitated by CIPP <br />4. Final video inspection following completion of the installation to document your new pipe rehabilitated by <br />CIPP. <br />5. Insitutube wetout using 400,000 Flexural Modulus resin, inversion, curing, and finishing. <br />6. Confined space safe entry practices. <br />7. One-year standard construction warranty. <br />8. Certificate of insurance with standard coverage <br /> <br />Proposal Exclusions <br /> <br />Not included in the prices stated in this estimate are costs associated with the items listed below. These items, if <br />needed or found to be applicable, would be provided by Insituform Technologies USA, LLC. at your additional cost; <br />or would be furnished by others, at your direction, at no cost to Insituform Technologies USA, LLC.: <br />a) Clear access to sewer through new or existing manhole, manhole frame and chimney/corbel removed if <br />necessary. <br />b) If preliminary video inspection of the pipe interior indicates excessive damage, or other extra-ordinary <br />condition, which will require excavation, or other extraordinary remedy, to prepare the pipe for installation of <br />the Insitutube, then those services will be provided by the Prime contractor or Owner. This will include <br />excessive roots, excessive debris and protruding taps. <br />c) Additional cleaning and televising mobilizations and/or setups due to point repairs, obstruction removals, or <br />delays out of our control will be an additional charge. <br />d) Protruding tap removal unless specified <br />e) Manual operation of any pumping and/or metering stations. <br />f) Water from fire hydrants within a convenient distance from each cleaning and inversion site location. <br />g) Legal dumpsite for debris resulting from pipe cleaning. <br />h) If any hazardous or toxic materials are encountered during the project, the Owner/Prime Contractor will be <br />responsible for the removal and disposal of the materials. <br />i) Installation of cleanouts, or other ports, if required for special bypass pumping requirements for businesses. <br />j) Manhole installation, rehabilitation, and/or replacement, if needed to install CIPP. <br />k) Project permits and/or local licenses. <br />l) State and local sales and/or use taxes on the value of the project. If you are exempt, please submit the <br />appropriate documentation. <br />m) Additional premiums for special insurance coverage(s) demanded by you or other parties particular to this <br />project. <br />n) Performance and Payment Bond not included. This is available upon request, but if required please add 3.5% <br />to the total project cost. <br />