My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 04-25-2006
NewBrighton
>
Council
>
Packets
>
2006
>
CCP 04-25-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2006 10:55:02 AM
Creation date
4/21/2006 3:44:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~=~ <br /> <br />Kimley-Horn <br />and Associates, Inc. <br /> <br />Mr. Les Proper, PE <br />April 20, 2006 <br />Page 2 of 4 <br /> <br />All bids acknowledged the two (2) addenda that were prepared for the <br />proj ect. <br /> <br />A bid tabulation has been performed to verify the bids. Errors were <br />found in the bids ofW. W. Grading, Veit & Company, and Northwest <br />Asphalt; however, the errors did not change the low bidder. A copy of <br />the bid tabulation for the project is attached for your information. <br /> <br />The low base bid amount of $816,880.70 is approximately fifty percent <br />(50%) lower than the engineer's estimate of probable construction cost <br />of $ 1,650,000.00. The number and range ofthe project bids is <br />reflective of a very competitive bid environment. <br /> <br />The engineer's estimate was prepared based upon the best available <br />information at the time of final design. Soil borings were taken and a <br />geotechnical report was prepared to better understand the condition of <br />the soils on the site. From this information, estimates were made on <br />volmnes of excavation. Costs were derived from previous projects of <br />similar magnitude and from construction costs from previous <br />construction seasons. <br /> <br />The plans and specifications included bid alternates for the disposal of <br />the existing 80,000 cubic yard soil stockpile on the project site. Four <br />different disposal options were bid as follows: <br /> <br />Option I Stockoile Disposal (<1 0 Miles) (LV) <br />This option included the off-site disposal of the stockpile at a location <br />identified by the City within 10 miles of the project site. <br /> <br />Option 2 Stockoile Disposal (<1 Mile) (LV) <br />This option included the off-site disposal of the stockpile at a location <br />identified by the City within I mile of the project site. <br /> <br />Option 3 Stockpile Disposal (On-Site) (LV) <br />This option included the relocation of the stockpile to another area on <br />the project site as directed by the City. <br /> <br />OPtion 4 Stockpile Disposal (Contractor Site ) (LV) <br />This option included the off-site disposal of the stockpile at a location <br />identified by the contractor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.