My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 07-11-2006
NewBrighton
>
Council
>
Packets
>
2006
>
CCP 07-11-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2006 3:21:04 PM
Creation date
7/10/2006 11:17:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.~ <br /> <br /> <br />the city that works tor yOll <br /> <br />Re ort Number: <br />A enda Section: <br />Re ort Date <br />Council Meetin <br /> <br /> <br />. REQUEST FOR COUNCIL CONSIDERATION <br /> <br />ITEM DESCRIPTION: CONSIDERATION OF APPROVAL OF CHANGE ORDER NO.1 <br /> AND AUTHORIZATION TO MAKE FINAL PAYMENT, PROJECT <br /> 05-1, RICE CREEK ROAD RECONSTRUCTION <br />DEP ARTMENT HEAD'S APPROVAL: Grant M. Wyffels, P .E. Director of Public Works GMvV <br />CITY MANAGER'S APPROY AL: ",AfY" <br />No comments to supplement this report Comments attached <br /> <br />Recommendation: To approve Change Order No. I and authorize final payment on Project 05-], Rice <br />Creek Road Reconstruction, to Central Landscaping, Inc. in the amount of $33,981.1 0, <br /> <br />Legislative History: Project 05-], Rice Creek Road Reconstruction, was ordered by the Council at a <br />public improvement hearing on March 22, 2005, and a construction contract was awarded to Central <br />Landscaping, Inc. on May 24,2005. Construction was substantially completed in 2005. <br /> <br />. <br /> <br />Financial Impact: The original engineer's estimate approved by the Council when ordering the project <br />was $972,780, The original contract amount based on estimated quantities was $877,830.64 and the final <br />constmction contract amount based on actual quantities is $939,797.32. The attached Change Order No.1 <br />addresses the increase in contract costs in the amount of $61,966.68. The increase in cost is related to <br />payment of actual final quantities verses estimated quantities, and the addition of miscellaneous items <br />such as extra work on the signal loop detectors at Silver Lake Road and the reconstruction of manholes <br />and catch basins. <br /> <br />Explanation: This project consisted of the reconstruction of Rice Creek Road between Stinson Boulevard <br />and Long Lake Road. The roadway was widened from a 24 feet mral section with gravel shoulders and <br />drainage ditches to a 32 feet wide urban section with concrete curb and gutter. Also under this contract, <br />the watermain was replaced between Silver Lake Road and Long Lake Road, and storm sewer was <br />installed in order to eliminate the drainage ditches and install the new curb and gutter, <br /> <br />Central Landscaping, lnc, has satisfactorily completed the construction work under the contract and the <br />Engineering Department has accepted the work. <br /> <br />Costs and Funding: The construction contract costs, as well as other project costs, will be funded from a <br />combination of Municipal State Aid Street funds, special assessments, Storm Water Utility funds, Water <br />System Replacement funds, and a Ramsey County contribution. An Assessment Hearing for this project <br />wi II be held in October of this year at wh ich time a report and breakdown of the total project costs will be <br />presented to the Council. <br /> <br />f}00.~ <br /> <br />Bob Rutherford ' <br />Engineering Department <br /> <br />. Attachment <br /> <br />G:\ENG\200SpI'oj\ProjOS-O 1. Rice Creek RQad Reconstruction\Payments\OS-1 Final Payment Report.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.