My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 09-26-2006
NewBrighton
>
Council
>
Packets
>
2006
>
CCP 09-26-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2006 12:45:43 PM
Creation date
9/22/2006 3:07:25 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br /> <br />governing signage within the entire development (not including the future office <br />development). The proposed PUD and Final Plat will be known as Long Lake Landing. <br /> <br />On January 17, 2006 the Planning Commission reviewed the Preliminary PUD, <br />Preliminary Plat, and Site Plan and recommended tabling to allow further staff review of <br />the proposed plans and research into the most appropriate land use mechanisms to <br />approve the project. Most notably, a Northwest Quadrant Ordinance had not yet been <br />established and the current MX zoning was not conducive to the development patterns <br />expected under the approved Northwest Quadrant Framework and Design Guidelines. <br />The City Attorney suggested that minor amendments to the Planned Unit Development <br />Code and a rezoning to R-3A, which would accomplish a land use approval consistent <br />with the Design Guidelines for the Northwest Quadrant. <br /> <br />On January 31, 2006 the Planning Commission held a special meeting at which time the <br />Planned Unit Development code amendments, rezoning, preliminary PUD, preliminary <br />plat, and site plan were considered. Ultimately, the Commission recommended a <br />conditional approval on the Preliminary PUD, Preliminary Plat and Site Plan. The PUD <br />code amendments have since been adopted and the rezoning will formally occur as part <br />of the final plat approval. <br /> <br />. <br /> <br />There have been several site plan changes since the preliminary approval. Most are <br />directly related to the preliminary approval conditions noted in the Resolution. The <br />applicants have provided a narrative explaining their specific changes and the need for <br />those changes. A summary of the site plan changes are as follows: <br /> <br />. Total unit reduction from 704 to 674: This reduction in units is directly related to the <br />other revisions noted here. <br />. Re-orientation of the Sherman condominium building and its associated surface <br />parking. <br />. Incorporation of additional surface visitor parking for the New Urban Flat and Urban <br />Flat Rottlund condominium buildings. <br />. Shifting of Rottlund Gable and Row Craftsman Townhome units in an effort to <br />provide a more prominent green space corridor from the north to the south providing <br />a connection to the future City Park. <br />. Re-alignment of the northern entrance road. <br />. Incorporation of an additional infiltration basin at the south end of the site. <br />. Relocation of a storm-water pond at the north end of the site to the east side of Old <br />Highway 8. <br />. Revised street sections for all three entrances into the development to accommodate <br />right turn lanes that will address future traffic demands. <br /> <br />. <br /> <br />Schiferl inquired if the Developers will be required to haul snow off site if it exceeds the <br />snow storage capacity and if it is written in the Developers agreement. Gundlach replied <br /> <br /> <br />"~r::-r !:'": <br /> <br />:'.;:':;';':~i"\ : :",:(nv.'. ! <br /> <br /> <br />Page 8 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.