Laserfiche WebLink
<br /> <br />. <br /> <br />c. Berms constructed for containment during plant operation will be removed, re- <br />graded or opened after the plant is removed from the site to prevent <br />unsupervised water collection, Collection areas may be recontoured and seeded <br />during site reclamation or separately. <br /> <br />9. Erosion Control Prevention <br /> <br />a. Bales, silt fences, and settling ponds are utilized to mitigate and eliminate <br />erosion from potential problem areas, <br /> <br />b, Aggregate stockpiles are kept at a manageable slope gradient to reduce erosion, <br /> <br />c. Temporary seeding will be used to control critical area erosion, as needed, on a <br />site-specific basis, Critical areas may include stockpiled topsoil and non-traffic <br />areas that will support vegetation, <br /> <br />d, Contours of temporary plant sites are graded to minimize runoff to a critical <br />area, including waterways and stockpile areas, <br /> <br />. <br /> <br />. <br /> <br />18 <br />