My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/17/2006
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Planning Commission Packets
>
2006
>
10/17/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2006 1:37:02 PM
Creation date
10/13/2006 4:24:37 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />knock off dust that coats the outside of the bags. This dust drops to the bottom of the <br />baghouse and is also returned to the mix inside the drum. <br /> <br />The entire operation is controlled and monitored by a computer, or a programmable <br />controller, which makes sure the system, is performing properly and will warn the <br />operator prior to any failure. <br /> <br />C. Concrete facility <br /> <br />A concrete plant operates similar to a HMA facility with a few exceptions. The aggregate <br />materials are also loaded into cold feed bins with a loader and measured into specified <br />portions, according to the type of mix required, and carried by a conveyor belt into the <br />drum where the material is mixed. It also could be delivered directly to a truck where the <br />material can also be mixed. Then water and cement or fly ash would be added. Then <br />mixed thoroughly before being delivered to ajob site. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.