My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/17/2006
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Planning Commission Packets
>
2006
>
10/17/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2006 1:37:02 PM
Creation date
10/13/2006 4:24:37 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />will be stored in spill proof containers in the service trailer until picked up for <br />off-site disposal. <br /> <br />d. Any leaks that develop during the course of operation may, at the operator's <br />discretion, be contained with drip pans or petroleum sorbent material, as long as <br />plant operation ceases prior to a storm event and containment vessels are <br />cleaned and free of petroleum to prevent contact with storm water. <br /> <br />e. Repair and maintenance procedures will be conducted in the service shop or <br />trailer or outside with adequate containment for degreasing and cleaning. <br />Petroleum sorbent material will be available as needed to supplement <br />containment. <br /> <br />7. Use of Available Resources <br /> <br />a. Housekeeping supplies, including drip pans, are kept on inventory in the repair <br />trailer at all times. All plant personnel have access to materials and are <br />instructed in their use. <br /> <br />b. All plant personnel are available to respond to petroleum spills as needed. <br />Additional response personnel may be obtained from field crews working <br />adjacent to the plant if needed. <br /> <br />c. If necessary, plant loader may be used to construct temporary berms or place <br />aggregates for absorbing free flowing liquids. Loaders can be used for <br />backfilling and to remove impacted soils or aggregates. <br /> <br />d. Plant Foreman, Job Superintendent or other responsible company officials may <br />obtain, mobilize, and utilize any additional resources deemed necessary to <br />mitigate the effects of a petroleum release. This may involve subcontractors, <br />additional equipment, or additional personnel as needed. <br /> <br />8. Construction of Containment <br /> <br />a. When a plant must be placed in an area where natural containment does not <br />occur, the plant siting crew, foreman, or superintendent may elect to construct <br />berms or temporary basins for collection and control of storm water. Necessity <br />of construction will be based on slope of plant site, area drained, soil type, and <br />proximity to receiving water. Other influences may be considered on a site- <br />specific basis as needed to fulfill the purpose of the plan. <br /> <br />b. Plant personnel will inspect water collected in the on-site basins for evidence of <br />petroleum sheen or odor. If no evidence of contamination is apparent, the water <br />may be released by gravity flow or by pumping. Release of water must be done <br />in a manner that will not induce erosion or release water with high sediment <br />loadings into receiving water. Water collected in on-site basins that shows <br />evidence of petroleum contamination will be pumped into disposal tanks for <br />transport to approved disposal facilities. Company environmental supervisor <br />will be notified before removal and disposal of contaminated water. Any water <br />releases will be documented in the plant record. <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.