My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCP 10-24-2006
NewBrighton
>
Council
>
Packets
>
2006
>
CCP 10-24-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2006 11:22:31 AM
Creation date
10/24/2006 12:36:00 PM
Metadata
Fields
Template:
General
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RECEIVED,\ <br />OCT 0 4 2006 <br /> <br />. <br /> <br />CHANGE ORDER 1 <br />CITY OF NEW BRIGHTON PROJECT NUMBER 06-5 _ tiAHf1 . <br />WATER TREATMENT PLANT 1 VERTICAL PIVOT GATE INSTAL~~INGCO< <br /> <br />September 27, 2006 <br /> <br />The Contractor is hereby directed to make the following changes to the Contract Documents for the <br />above-named Project. <br /> <br />ITEM 1: FURNISH AND INSTALL 4' SWING GATE <br /> <br />Description of Change <br /> <br />Contractor shall furnish and install a 4' wide single swing gate and two (2) 3" O.D. Sch. 40 gate posts to <br />allow access to the Water Treatment Plant 1. Location of the gate shall be coordinated with the Owner. <br /> <br />Change in Contract Time <br /> <br />No change in Contract Time shall be made for this item. <br /> <br />Change in Contract Price (Base Bid) <br /> <br />Net increase to Original Contract Price <br />Item 1, Change Order 1 <br /> <br />. ITEM 2: FURNISH AND INSTALL KEYSWITCH <br /> <br />$ 877.00 <br /> <br />Description of Change <br /> <br />Contractor shall furnish and install a keyswitch to the keypad to allow gate operator to function in the <br />event of a power outage. The keyswitch shall be mounted to the card reader stand, and the core to the <br />keyswitch is not interchangeable or adaptable to any keys other than that which are provided with the <br />keyswitch. Conduit installation and wiring is to be completed by others. <br /> <br />Change in Contract Time <br /> <br />No change in Contract Time shall be made for this item. <br /> <br />Change in Contract Price (Base Bid) <br /> <br />Net increase to Original Contract Price <br />Item 2, Change Order 1 <br /> <br />$ 0.00 <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.