My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-028
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-001-100
>
LP-028
>
LP-028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2006 12:34:57 PM
Creation date
11/2/2006 12:45:18 PM
Metadata
Fields
Template:
House File
Address
19 14TH ST NW
House Number
19
Street
14TH
Street Type
ST
Direction
NW
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7 <br /> <br />. <br /> <br />~ <br /> <br />4650 South Racine Avenue · Chicago, Illinois 60609 · Area Code 312/927-3000 <br /> <br />DARLING & COMPANY <br /> <br />ESTABLISHED 1882 <br /> <br />TELEX NO. <br />25-4263 <br /> <br />November 7, 1978 <br /> <br />Mr. D. Fridgen, City Sanitarian <br />Inspection Dept. City of New Brighton <br />803--5th Avenue, N.W. <br />New Brighton, Minnesota 55112 <br /> <br />Re: Gordon Rendering's Odor Control System. <br /> <br />Dear Mr. Fridgen: <br /> <br />The August '15, 1978 odor compliance test, on the <br />process scrubber exhaust of Gordon Rendering Company in <br />New Brighton, was found to be in compliance with odor <br />concentration standard but not in compliance with the one <br />million odor units per minute standard. <br /> <br />After conducting a thorough evaluation of the <br />entire plant on September 19, 1978, the following <br />corrective action was taken to reduce the odor input <br />to the scrubber. <br /> <br />1. Repaired broken welds in condenser tube sheet; <br />2. Cleaned condenser tubes; <br />3. Repaired hot condensate leak into condenser <br />cooling water; <br />4. Regasketed and tightened screw conveyor covers; <br />5. A continuing maintenance schedule to be <br />maintained to prevent future leaks, by checking <br />every four months the condenser for vapor or <br />condensate leaks. <br /> <br />In (order to further improve the odor control <br />system, a sodium hypochlorite atomization nozzle was <br />installed on the scrubber. <br />
The URL can be used to link to this page
Your browser does not support the video tag.