My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-031
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-001-100
>
LP-031
>
LP-031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2006 12:37:50 PM
Creation date
11/6/2006 11:31:23 AM
Metadata
Fields
Template:
House File
Address
3000 5TH ST NW
House Number
3000
Street
5TH
Street Type
ST
Direction
NW
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />LP-3l -2- <br /> <br />2. That all other distu~be~ ar~as are to be see~~~: <br />1~ That th~ trees in ar~a 1 wi].l be ,- inchps in ~iam~t~r: <br />That th~ trees in area ~ will be 2~-' in~hes in aiamet~r <br />and that IS such trees will b~ plante~: <br />" That trees in area 1 will be 8 - 10 feet in h~ight ann <br />that 8 such trees will bo plante0: <br />6. That trees in area ~ will be ~-2~ inces in Cliameter and <br />that 12-lS such trees will be plantp~: <br />7. That trees in area 5 will be 2~-~~ incps in diameter and <br />7 such trees will be planted. <br />8. That the siClewalks ~~dll be concrete with a textl.1red finish <br /> <br />WE" ,.,rouln anC! that ",e f!o have on file a plan showing the above <br />listed information. We would suggest that the quantity of trees <br />referred to in area 1 be specifie~. We would also suggest that <br />the plans for the Career Development Center be signen by the applicant <br />and the BuilC!ing and Planning Coordinator. <br /> <br />The proposed building does conform to the Master Plan as <br />required by SP-58 ~ll Cooe rE"quirements are met ~xc~pt as discussed <br />in the Master Plan discussion and as except discusseC! herein <br /> <br />Planninq Commission Consid2ration (Mav 18, 1976): <br /> <br />The Planner reveh.,re(l his commpnts noting that acco'!"'oing to <br />SP-58, Uniten Theological Seminary is required to submit and have <br />approved a Master Plan, prior to the issuance of any building permits <br />for the Seminary. It was further noted that both theMaster Plan <br />and building permit require a public hear;_ng before the City council. <br /> <br />Mr. ~l French and Dr. Hultgren were present to answer questions <br /> <br />Mr. French noted that the plans have been submitten to comply <br />with the SP-~8 resolution. Mr French further inricatec. that he <br />has calculated the floor area ratio and has founA that +igure to <br />~ .lA5 Mr. French indicated that ~he Seminary is pl3nning an <br />expansion program to reach the 290 student limit approved previously <br />by the City Council, and that the plans submitted a~~ sk~tche~ details <br />of hO"1 that wi) 1 be accomplished u <br /> <br />Frdrickson asked what percentage of students would be living <br />on the Seminary campus. <br /> <br />Dr. Hultgren indicated that approximately 2~:-~ of the students <br />\.,oul~ E'v",.ntually bp living on campus. Dr Hultgrp.n ~mphasized <br />
The URL can be used to link to this page
Your browser does not support the video tag.