Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />OCT~17-2006 08:32 BARR ENGINEERING <br />. 10/17/2005 08: 2'3 7537848245 <br /> <br />9528322601 P.02/07 <br />PAGE 02 <br /> <br />LORI ENDERLE <br /> <br />GAS AND FUEL TANK REMQVAL <br />Building Demolition & concrete Removal <br /> <br />16 <br /> <br />06 <br /> <br />Dale i 0 <br /> <br /> <br />Invoice # <br /> <br />Gopher State # <br /> <br />ROGER PETERSON CONSTRUCTION <br />784-8245 ~ r ' <br />NO CHARGE FOR ESTIMATES & BIDS <br />2740 93rd AvenuiI NE. Blaine, MN 55449 <br /> <br />To: r <br /> <br />I <br /> <br />City of New Brighton <br /> <br />All of oor work. is danA and complies with the rule8 and <br />rClgulaticns oJ th& Minn&sota Pollution Control Ageney, <br />State and City Fire Codes, City OrdinanC/ils, Licensing. <br />Insurance and Inspections. <br />Unless otl'Ulllwise stated, removal and disposal of tanks is <br />Our responsibility. Fuel. gas, WAter, sludge ot other liquids <br />ar. an extra charge. <br /> <br />Barr Engineering <br />Artn: Sara Gaffin <br /> <br />L <br /> <br />...J <br /> <br />DESCRIPTION <br />"...Jab location: Demolition ~ 715 Old Highway 8, New Brighton, MN <br />Former location ofMarv's Transmission <br /> <br />PRICE <br /> <br />Forced work not included in original bid: <br /> <br />Draining old gas from pipes: 5 workers for one hour each at $64.00 per <br />hour to lift and drain pipes by hand: <br />Todd Erickson Enterprises: 8 hours at $64.00 per hour for supervision and soil <br />work for piping: <br />Todd Erickson Enterprises: 2 hours at $64.00 per hour for soil sampling and <br />locating underground asbestos: <br />Transport soil samples for asbestos testing: 1 hour at $64.00 per hour: <br />Testing of soil ~ples for asbestos: <br /> <br />320.00 <br /> <br />512.00 <br /> <br />128.00 <br />64.00 <br />150.00 <br /> <br />Plus 10% contractor markup <br /> <br />$1174.00 <br />J ] 7.00 <br />1291.00 <br /> <br />TO r AL: <br /> <br />Excavation~ removal and disposal of piping, including supervision, and excavatioIl <br />To locate underground asbestos: 10 hours at $140.00 per hour: <br /> <br />1400.00 <br /> <br />Removal and disposal of 15 gallons old gas from piping: <br /> <br />94.00 <br />rOTAL: $1494.00 <br /> <br />.Total cost for aU extra forced work: <br /> <br />$2785.00 <br /> <br />By <br /> <br />~~.!?~ <br /> <br />\. <br />