My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-105
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-101-200
>
LP-105
>
LP-105
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2007 6:14:25 AM
Creation date
11/15/2006 12:43:48 PM
Metadata
Fields
Template:
House File
Address
EAST OF OLD HIGHWAY 8 & SOUTH OF RMS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />,. <br /> <br />R e po r t # 80- 1 61 <br />September 18, 1980 <br /> <br />APPLICATION FOR VARIANCE AND BUILDING PERMIT <br />VN-215, LP-105 BELAIR CORPORATION <br /> <br />PURPOSE <br /> <br />To consider a request for a building permit and variance to' <br />construct an industrial building with a 5 foot side yard setback. <br /> <br />BACKGROUND <br /> <br />APPLI CANT: <br />LOCATION: <br /> <br />PROPOSED USE: <br /> <br />Belair Builders <br /> <br />Generally east of Old Highway #8 <br />and south of RMS. <br /> <br />1-1, Light Industrial <br /> <br />28396 Square Feet <br /> <br />4.000 Square Feet <br /> <br />. 14 <br /> <br />Type II Non-conforming Single <br />Family Home. The house will be <br />destroyed. <br /> <br />Belair plans to lease the building <br />to a firm which repairs small <br />applia~ces. <br /> <br />5' side yard setback, 15 feet is <br />required. Overhead door in <br />front yard is only 40' from right- <br />of-way. 50' is required. <br /> <br />ZONING: <br />AREA OF SITE: <br />AREA OF PROPOSED BUILDING: <br />FLOOR-AREA-RATIO: <br />EXIST.ING USE: <br /> <br />VARIANCE REQUEST: <br /> <br />COMMENTS: <br /> <br />1. Side yard setback is warranted based on shape of the lot. <br />2. Building should be moved back 10' or the overhead door <br />in front yard should be' removed. <br />3. The Certificate of Survey depicts a slough on the western <br />portion of the site. Preliminary discussions with the <br />Rice Creek Watershed District indicate that the applicant <br />will have to move the proposed building to the east. The <br />applicant will report this change at the Council meeting <br />on the 23rd of September. The Planning Commission in <br />considering the request was made aware of the possible <br />change and voices no opposition. The mov,ing of the <br />building will not result in any zoning code deviations, <br />it would just result in a larger front yard. <br /> <br />PLANNING COMMISSION CONSIDERATION AND RECOMMENDATION <br />EXTRACT OF MINUTES <br />BOARD OF REVIEW <br />REGULAR MEETING <br />September 16, 1980 <br /> <br />Applicant John Murlowski of Belair Builders was present to answer <br />any questions. He explained the discussion during August and <br />
The URL can be used to link to this page
Your browser does not support the video tag.