My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-122
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-101-200
>
LP-122
>
LP-122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2007 6:07:15 AM
Creation date
11/16/2006 11:21:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I I <br />I <br />II <br />II <br />II <br />I <br />I <br /> <br />II <br />il <br />II <br />I <br />I I <br /> <br />I <br /> <br />I I <br />il <br />il <br />I. <br />I <br />II <br />II <br />II <br />I <br />il <br />II <br />I <br />I <br /> <br />D. COSTS <br /> <br />E. CON- <br />STRUCTION <br />TECHNIQUES <br /> <br />CiS vY'. <br />, J' <br />// <br />concrete bl,9ck-.with~a weathered, rough-sawn plywood <br />veneer. ~>nr~ parking spaces will be pro- <br />vided for thls facility. <br /> <br />Phase II of development will involve the construc- <br />tion of a 34,000 square foot building to house <br />a full-service grocery store with approximately <br />33,000 square feet of gross floor area. Building <br />details for this structure are not known at this <br />time as a tenant has not been selected. However, <br />195 parking spaces will be provided to serve this <br />facility. <br /> <br />The proposed site plan for this development is <br />indicated in Figure 2 along with the various com- <br />ponents of Phase I and II construction. <br /> <br />The costs of the development will be approximately <br />$1,212,000. This figure includes the costs of <br />site preparation (clearing, draining, grading), <br />building construction, parking lot and buffer zone <br />construction and landscaping. A cost breakdown is <br />as follows: <br /> <br />Phase I <br />Phase II <br /> <br />$ 260,000 <br />952,000 <br /> <br />Total <br /> <br />$1,212,000 <br /> <br />It is anticipated that standard techniques of <br />excavation and filling will be used during the con- <br />struction of the project. The necessary fill for <br />the project's construction will be hauled to the <br />site as required and compacted with field compac- <br />tion equipment. The only unusual construction <br /> <br />11-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.