Laserfiche WebLink
<br />BARR ENGINEERING CO, <br />CONSULTING ENGINEERS <br /> <br />DOUGLAS W, BARR <br />JOHN D. DICKSON <br />L. R, MOLSATHER <br />ALLAN GEBHARD <br />LEONARD J. KREMER <br />DENNIS E. PALMER <br />WARREN W, HANSON <br /> <br />6800 FRANCE AVENUE SOUTH <br />MINNEAPOLIS, MINNESOTA 55435.2062 <br />TELEPHONE (AREA 612) 920-0655 <br /> <br />October 21, 1982 <br /> <br />Mr. Jim Winkles <br />Director of Community Development <br />City of New Brighton <br />803 Fifth Avenue N.W. <br />New Brighton, Minnesota 55112 <br /> <br />Dear Mr. Winkles: <br /> <br />Enclosed are three copies of the final grading and utility plan for <br />the New Brighton Medical Center. I have also included the detail for the <br />baffle weir structure to be constructed at the outlet of the stormwater <br />retention basin. <br /> <br />If you have any questions, please give me a call. <br /> <br />~' <br /> <br /> <br />Robert C. Obermeyer <br /> <br />RCO/gs <br />encl. <br />