Laserfiche WebLink
<br />2 <br /> <br />5. Describe the proposed project campletely: <br /> <br />The applicant praposes a madular waste cambustion facility that wauld burn <br />appraximately 200 tons af mixed municipal sa1id waste per day to. praduce <br />steam far sale to industries lacated nearby. The prapased facility is <br />lacated on a vacant three-acre parcel within an industrial area immedi- <br />ately west of I-35W. Figure 3 shows the site plan far the facility. <br /> <br />6. Reason for EAW preparation: <br /> <br />Determination af need far an EIS <br />MEQB Rule No.. 3.038 <br /> <br />An EAW is mandatory for this praject. The EAW and public comments abaut <br />it will be used to. determine whether there are patential impacts fram the <br />project that are af sufficient concern to. warrant requiring a full EIS on <br />the praject. <br /> <br />7. Estimated Canstructian Cost: $8 to $9 millian <br /> <br />8. Tatal Project Area: 3.1 acres af land <br />Steam Line: Maximum 1,650 feet <br /> <br />9. Industrial Square Foatage: 31,000 square feet <br /> <br />10. Number of praposed parking spaces: 31 including two. handicap spaces <br />