Laserfiche WebLink
<br />I <br /> <br />M <br />M <br />LO <br />.... <br />M <br />M <br />c.o <br />. <br />N <br />.... <br />.... <br />LO <br />LO <br /><( <br />I- <br />o <br />C/) <br />w <br />:2 <br />:2 <br />~ <br />:2 <br />o <br />l- <br />X <br />" <br />CC <br />lXl <br />$ <br />w <br />:2 <br /> <br />~ <br />:2 <br />w <br />::> <br />z <br />w <br />> <br /><( <br />.s:: <br />.... <br />LO <br /> <br />M <br />o <br />CO <br />:2 <br />o <br />l- <br />I <br />" <br />a: <br />lXl <br />$ <br />w <br />:2 <br />I.L. <br />o <br />>- <br />I- <br />U <br /> <br /> <br />to. <br /> <br />", <br /> <br />ew <br /> <br /> <br />Iri9hton <br /> <br />September 14, 1987 <br /> <br />Mr. Den Trainor <br />Printing Enterprises <br />1415 - 1st Avenue NW <br />New Brighton, MN 55112 <br /> <br />Dear Mr. Trainor <br /> <br />I am writing in regard to the upgrading of 14th Street NW which was <br />originally scheduled for completion this summer. According to the <br />Engineering department, the 14th Street project will not be activated <br />until the summer of 1988. However, the Ehgineers do not feel it is <br />necessary to delay the construction of your second driveway until 14th <br />Street is upgraded per our previous discussion. The construction of a <br />bituminous driveway to the 14th Street pavement and the installation of <br />curbing up to the right-of-way is possible at this time. .Once 14th <br />street is upgraded the City would replace any bituminous damaged during <br />street construction and would tie in your curbing with the proposed <br />curbing along 14th Street. The City Fire Chief is very concerned over <br />the ongoing absence of a second drive to your front parking area. This <br />drive needs to be installed as soon as possible. <br /> <br />An inspection of your site on September 11, 1987 revealed the required <br />sod and landscaping per you approved site plan has still not been <br />installed. Also, the previously discussed dumpster enclosure has not <br />been constructed per our agreement. <br /> <br />These items require your prompt attention. I will inspect your site <br />again on October 1, 1987 to determine your compliance with previous <br />approvals. <br /> <br />Don, if you have any questions or if I can be of any assistance <br />regarding this matter, please do not hesitate to call me at 631-8340. <br />I look forward to working with you to complete the aforementioned site <br />improvements. <br /> <br />#i/lA' <br /> <br />Erny Mattila <br />City Planner <br /> <br />EM/pb <br /> <br />.J-' <br />