<br />RICE CREEK WATERSHED DISTRIcr
<br />SUITE 177, ARDEN PIAZA
<br />3585 OORl'H ~ AVENUE
<br />ARDEN HIlLS, MINNE:roJ:2\ 55126
<br />
<br />y
<br />
<br />PERMIT
<br />
<br />, RCWD permit ~. 88-03
<br />cc: City of New BrightGln v-"'
<br />E. A. Hickok & AsSO%tA .
<br />RCWD File ~Y
<br />
<br />1
<br />
<br />permit Application lb. 88-03 Thomas N. Feaski
<br />
<br />. "_" ..Issued to; Boerner Building System, Inc., 200 Plato Ave. W., St. Paul, MN 55107
<br />. Wcation: One-half mile north of the intersection of STH 96 and Old Higpway 8,
<br />New Brighton. .
<br />
<br />6 199JJ
<br />
<br />Purpose: Approval of Final Site Drainage Plan for construction of 4.9-acre
<br />callOOrcia1 site to be knOlNIl. as. Strick Leasing, 14.6+ acres.
<br />
<br />At their meeting on February 18, 1988 ., the Board of Managers of the Rice Creek Watershed
<br />District reviewed your permit application and the recx:t1l1Taldation of the District Engineer
<br />based upon the.;tollowing exhibits:
<br />1. Pennit Application dated January 13, 1988,
<br />2. Drainage Calculations for Strick Leasing property, prepared by Suburban Engineering, Iue. ,
<br />received January IS, 1988. .
<br />3. Topographic Survey, prepared by DeMars-Gabriel Land Surveyors, Iue., dated January 20, 1988.
<br />4. Site Plan by Fisher Engineering, Inc., dated Noverrber 5, 1987, and received January 15, 1988.
<br />5.. Site Plans, prepared by Suburban Engineering, Inc., dated January 14, 1988, last
<br />revised February IS, 1988,
<br />6. Flow Velocity Calculations, prepared by Suburban Engineering,Inc" dated OONTINUED OVER----
<br />They found>the project as planned to be in accordance with the Rules & Regulations and Guide-
<br />lines of the District and therefore approved the permit as requested, with the following ad-
<br />ditional stipulations:
<br />
<br />. .. that any additional development of the site will
<br />require a Rice Creek Watershed District Pennit.
<br />
<br />It is the resp:>nsibility of the Pe:tmittee to provide all rreasures necessary to IX>sitively
<br />oontc;lin sed.i.Irent on the site during oonstrlx::tion. This. may require the use of erosion
<br />oontrol rreasures ootoutlined on the erosion oontrol plan. If this requi.renent is rot net,
<br />the permittee may.be ordered to provide additional erosion oontrol treasures. if deared neces-
<br />saxy by the District Illspec..."'i:Or. It is also b'1e responsibilit:y of the Pl.-operty o\o.'iler to pro-
<br />vide whiitever maintenance. is necessary to assure that the stoJ:llWater managa:rent systems ap-
<br />proved as part of this permit will oontinue to function as originally designed.
<br />. .
<br />
<br />A followupinspection will be oonducted at the project site to assure cx:>1lPliance with all
<br />agreements, temB and/or stipulations to this Penm.t. Failure to catply with the fore<.;ping
<br />may result in rescission of the Pennit, and is in violation of Chapter 112.89 MSA, a mis-
<br />demaaror.
<br />
<br />'!his d:>clJnent is oot transferable, and is valid for one (1) year after the date of issuance.
<br />N:> oonstrootion is authorized beyond expiration date. If Penni ttee requires nore ~. to
<br />oooplete oonstruction, a renewal of the pennit will be necessa:ty.
<br />
<br />Please oontact us at 483-0634 when the project is about to cx:mrence so an inspector nay view
<br />the 1IlOrk in progress. Permittee has paid for 2 inspecUons: one at project cxmrenoemant and
<br />one at ooopletion. Any additional inspection requested or required will be billed at $15/visit.
<br />By acceptance of this penni. t, the penni.ttee has oonsented to the foreg:>ing. The enclosed OWner's
<br />Certification must be fo:rwarded within ten days of project oonpletion.
<br />
<br />Date of Issue: .... M:1y 5, 1988
<br />, C vised 1- '87
<br />
<br />....a~U~/.i./#.
<br />Prepident, Board of Manal!fe:rs
<br />Andrew J. Cardinal, Sr.
<br />
|