My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-221
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-201-299
>
LP-221
>
LP-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2007 4:45:04 AM
Creation date
11/28/2006 2:48:32 PM
Metadata
Fields
Template:
House File
Address
574 8TH AVE NW
House Number
574
Street
8TH
Street Type
AVE
Direction
NW
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />able to sureties as a defense in the jurisdiction of the suit <br />shall be applicable. <br /> <br />10 Notice to the Surety, the Owner or the Contractor shall <br />be mailed or delivered to the address shown on the sig- <br />nature page. <br /> <br />11 When this Bond has been furnished to comply with a <br />statutory or other legal requirement in the location where <br />the construction was to be performed, any provision in this <br />Bond conflicting with said statutory or legal requirement <br />shall be deemed deleted herefrom and provisions con- <br />forming to such statutory or other legal requirement shall <br />be deemed incorporated herein. The intent is that this <br />Bond shall be construed as a statutory bond and not as a <br />common law bond. <br /> <br />12 DEFINITIONS <br /> <br />12.1 Balance of the Contract Price: The total amount <br />payable by the Owner to the Contractor under the <br />Construction Contract after all proper adjustments <br />have been made, including allowance to the Con- <br /> <br />MODIFICATIONS TO THIS BOND ARE AS FOLLOWS: <br /> <br />tractor of any amounts received or to be received by <br />the Owner in settlement of insurance or other claims <br />for damages to which the Contractor is entitled,re- <br />duced by all valid and proper payments made to or on <br />behalf of the Contractor under the Construction Con- <br />tract. <br /> <br />12.2 Construction Contract: The agreement between <br />the Owner and the Contractor identified on the sig- <br />nature page, including all Contract Documents and <br />changes thereto. <br /> <br />12.3 Contractor Default: Failure of the Contractor, <br />which has neither been remedied nor waived, to per- <br />form or otherwise to comply with the terms of the <br />Construction Contract. <br /> <br />12.4 Owner Default: Failure of the Owner, which has <br />neither been remedied nor waived, to pay the Con- <br />tractor as required by the Construction Contract or to <br />perform and complete or comply with the other terms <br />thereof. <br /> <br />(Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) <br /> <br />CONTRACTOR AS PRINCIPAL <br />Company: <br /> <br />(Corporate Seal) <br /> <br />Signature: <br />Name and Title: <br />Address: <br /> <br />SURETY <br />Company: <br /> <br />(Corporate Seal) <br /> <br />Signature: <br />Name and Title: <br />Address: <br /> <br />AlA DOCUMENT A312 . PERFORMANCE BOND AND PAYMENT BOND. DECEMBER 1984 ED. . AlA @ <br />THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE.. N.W., WASHINGTON, D.C. 20006 <br /> <br />A312.1984 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.