My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LP-078
NewBrighton
>
Commissions
>
Commissions-OLD
>
PLANNING
>
Planning
>
Site Plan File - Approved PLZ 01900
>
LP-001-100
>
LP-078
>
LP-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2007 3:56:48 PM
Creation date
12/6/2006 2:25:07 PM
Metadata
Fields
Template:
House File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PITCE CJ tJ3' <br />Sl11TI: 177 , 100)„1] PLAZA <br />3555 1.101'.1';) l,l;i:]..W--1'0N AVl;lWE <br />/?RDEN HILLS, 1ILI?1]1?50'!.'A 551.12 <br />Perm-1-1- Application No. 80-08 <br />RCWD Permit No. 08? <br />cc: city of Jew Brighton ? <br />E.A. IIickok& Associates <br />R <br />IZID file ? /f <br />PERMIT / 19 <br />William R. Dircks <br />Issued to: Berger Transfer (F?elair), 3720 MacAlaster Drive, St. Anthony, 12.1 55918 <br />Location: Northeast quadrant of the intersection of `!'bird Street S(4 and 9th Avenue S;9, <br />New Brighton (west of the 1VMYL radio tower) <br />Purpose: Approval of Final Site Drainage and Rough Grading Plan for a proposed <br />office warehouse facility to be constructed on a 7.96 acre site <br />At their meeting on August 27, 1980 the Board of Managers of the <br />}'ice Creek Watershed District reviewed your permit appl_ic.? tion and. Lhe rec- <br />omrnendat; on of the District Engineer together with the following exhibiv.-: <br />1. Pern-dt application dated February 13, 1980. <br />2. Final Site Drairrige and Rough Grading Plan for the Berger Transfer and storage <br />warehouse and service building, revised August 12, 1980. <br />3. Runoff calculations prepared by Gerald M. Sunde, P.E., dated August 7, 1980. <br />They found the project as planned to be in accordance with the Rulcs and <br />Reg,11.iati.ons, and Gu:ic'_el.i.ies of the Dist:rict and therefore -,,,)provod <br />permit: as requ:?sted, with the following stipulation-: NONE <br />A foll.ov*up inspection will be conducted at the pro ect site to assure com- <br />pliance with all agreelr?%nt:s, term,31 and/or stipulations to this Permit:. Fail- <br />ure to colnl)ly with the f:oregoi_.n„ may result- in rescission of the Permit, and <br />is in violation of Chavv.er 112.89 MS'A, a rnisdemennor. <br />Thir• document is not transferable, and is valid for one (1) year aft-,r the <br />date of issuance. If no construction activity his occurred after the once <br />yec.r time period, this Pe -mi.t must: be -renmyed. If construction is Linder-way, <br />a time extension play be granted. <br />Please contact us at 4883-0634 when the project is about to commence- so an <br />inspector inn,, viow the W017c in pr.o(;ress. '1'lle enclosed Oc,?ner's Certification <br />liiu:.t be fol:warded within 10 days of project completion. <br />Dai-c of. Issue September. 19, 1980 y??l (l <br />40_?'FaTicll("Ci b <br />I"r es)-(l.en t /Ri1M4L(Ah3J <br />10
The URL can be used to link to this page
Your browser does not support the video tag.