Laserfiche WebLink
<br />January 12, 1981 <br /> <br />Joan Archer <br />City of New Brighton <br />Planning Department <br />803 - 5th Avenue N.W. <br />New Brighton, MN 55112 <br /> <br />Joan, we have come up with an estimate of costs to complete con- <br />struction based on our last conversations: <br /> <br />1) Designate a handicap parking spot. <br />We have a temporary sign up as of 1/9/81. <br /> <br />2) Mark parking spaces including handicap spot with yellow paint. <br />8 hrs. X $8.00/hr. - $ 64.00 <br /> <br />3) Fence in entire east end of lot. 60' of fence installed, <br /> 210' to be completed. <br /> 4 x 4 Posts 22 x 7.00 = 154.} <br /> 2 x 4 Frame 45 x 1. 75 ... 79. <br /> 1 x 6 Fencing 420 x 1.60 = 672. <br /> <br />905.00 <br /> <br />Labor 24 hrs. x 8.00/hr. <br /> <br />192.00 <br /> <br />4) Gravel fenced-in area - 25 yds. @ 6.00/yd. <br /> <br />150.00 <br /> <br />5) Remove lean-to <br /> <br />8 hrs. x 8.00/hr. <br /> <br />64.00 <br /> <br />6) Replace front sign. <br />Complete 1/9/81. <br /> <br />7) Split rail fence. <br />Materials <br />Labor <br /> <br />// <br /> <br />80' x 1.50/ft. <br />16 hrs. x 8.00/hr. <br /> <br />125.00 <br />128.00 <br /> <br />8) Install lighted sign in front and remove old one. <br />Labor 16 hrs. x 8.00/hr. <br />Electrical <br /> <br />128.00 <br />250.00 <br /> <br />9) Handicap accessible front door. <br />Labor 8 hrs. x 8.00/hr. <br />Materials <br /> <br />64.00 <br />50.00 <br /> <br />$2120.00 <br /> <br />Richard p. Wickre <br />Secretary - Treas. <br />