Laserfiche WebLink
<br />Building <br /> <br />1. <br />2. <br />3. <br />4. <br />5. <br /> <br />Structure Size: <br />Structure Height: <br />Exterior Treatment: <br />VB C Compliance: <br />Other Considerations: <br /> <br />Sanitation / Housing <br /> <br />Parks <br /> <br />24,780 sq. ft. <br />27 feet <br />Tilt up slab and block <br />To be determined <br />None <br /> <br />1. <br />2. <br />3. <br />4. <br /> <br />Seating Requirements: <br />Kitchen Facilities: <br />Garbage/Rubbish Enclosures: <br />Other Considerations: <br /> <br />NA <br />NA <br />Required <br />None <br /> <br />1. Impact on Parks: <br />2. Impact on Community Facilities: <br />3. Other Considerations: <br /> <br />Forestry <br /> <br />Fire <br /> <br />Police <br /> <br />1. <br />2. <br />3. <br /> <br />Tree Preservation: <br />Proposed Trees: <br />Other Considerations: <br /> <br />1. <br />2. <br /> <br />Access to Site: <br />Access to Structure: <br /> <br />3. <br />4. <br />5. <br /> <br />Additional Hydrants: <br />Y Connection Location: <br />Other Considerations: <br /> <br />1. Traffic Safety: <br />2. On-Street Parking: <br />3. Site Security: <br /> <br />STAFF COMMENTS <br /> <br />None <br />None <br />None <br /> <br />NA <br />Adequate <br />None <br /> <br />Adequate <br />Because of tire storage in buildings,' an access door must <br />be provided every 100 feet along access walls (west and <br />south). Otherwise, adequate. <br />None <br />Northwest corner of building <br />None <br /> <br />Appears adequate <br />Non proposed <br />Appears adequate <br /> <br />The proposed office/warehouse/distribution building would comply with the minimum <br />requirements of the 1-2 district and parking standards. The landscape and screening <br />methods appear adequate. However, the front of the proposed building (west wall) <br />would be more aesthetically pleasing if it were treated entirely with the same material. <br />As proposed, the office section of the front wall would be split face block and the <br />warehouse section of the front waIl would be tilt-up panels. The applicant has agreed <br />to construct the front wall in either all brick or similar material per the City's wishes <br />(see attached letter). <br /> <br />4 <br />