Laserfiche WebLink
<br />Page 3 <br /> <br />2. Diseased Trees: <br />3. Other Considerations: <br /> <br />None <br />None <br /> <br />~tJ <br /> <br />Fire <br /> <br />1. Hydrant Locations: <br />2. Other Considerations: <br /> <br />5th Street NW <br />None <br /> <br />Police <br /> <br />1. Accident Counts: None <br />2. Violations: None <br />3. Other Considerations: None <br /> <br /> <br />DEPARTMENTAL CONSIDERATI N <br /> <br />Community Development <br /> <br />o <br />.~ <br />'y- <br /> <br />1. Proposed Use: The City's Public Works Department has been working with Barr En . eering <br />to second water treatment facility for New Brighton. The proposed rume <br />~ r Recovery m GRS acility uses ranu a activated on to ter <br />groundwater, similar to the u ent facility constructed next to Driftwood Park in 1988. <br />2. DensitylFAR: Complies <br />3. Building Setbacks: Complies <br />4. Parking Setbacks: Complies <br />5. Total Parking: 6 stalls <br />6. Stall Size: 9' x 18' <br />7. Aisle Size: 30 feet <br />8. Total Drives: One <br />9. Drive Size: 30 feet wide <br />10. Concrete Curbing: Provided <br />11. Parking Area Surface: Bituminous <br />12. Truck Bays: One truck bay door on south side of proposed facility. Complies. <br />13. Dock Area: None <br />14. Exterior Storage: None <br />15. Landscaping/Screening:- -The 6 existing shade trees east of the existing drive would be <br />transplanted west of the existing drive. The City Forester will work with Public Works to <br />- plant new evergreen and shade trees east of the drive and elsewhere on the site. <br />16. Performance Standards: Complies <br />17. Impact on Surrounding Land Uses: Minimal <br />18. Other Considerations: None <br /> <br />fG <br />~ <br /> <br />Public Works <br /> <br />Ii~j <br />