Laserfiche WebLink
<br />~ <br /> <br />Page 3 <br /> <br />PARKS <br /> <br />1. Proximity of Parks: <br />2. Other Community Facilities: <br />3. Other Considerations: <br /> <br />Veterans Park <br />Family Center under construction <br />None <br /> <br />FORESTRY <br /> <br />1. Tree Identification: <br />2. Diseased Trees: <br />3. Other Considerations: <br /> <br />None <br />None <br />None <br /> <br />FIRE <br /> <br />1. Hydrant Locations: <br />2. Other Considerations: <br /> <br />9th Avenue NW <br />None <br /> <br />POLICE <br /> <br />1 . Accident Counts: <br />2. Violations: <br />3. Other Considerations: <br /> <br />None of record <br />None of record <br />None <br /> <br />DEPARTMENTAL CONSIDERATIONS (PROPOSED USE) <br /> <br />COMMUNITY DEVELOPMENT <br /> <br />1. Proposed Use: <br /> <br />The applicant proposes to remove the existing footings on <br />site, rezone the subject site to B-1, Limited Business, and <br />construct a 2,859 sq. ft. dental office building on the <br />subject site. <br />28,974 sq. ft. <br />No requirement. However, the following is provided as a <br />comparison: <br /> <br />2. Lot Size: <br />3. Density/FAR: <br /> <br />Proposed buildinq <br />9% FAR <br /> <br />Edina Realty Office Bldg. <br />1900 Silver Lake Road <br />22 % FAR <br /> <br />New Brighton Professional Bldg. <br />2191 Silver Lake Road <br />17% FAR <br /> <br />6. Total Parking: <br /> <br />Complies with all setback requirements <br />The main entrance to the proposed building would be on <br />the 9th Avenue NW, or west side of the building. The <br />proposed parking lot would also be located on the west <br />portion of the site. The 9th Avenue NW or west side of <br />the site is consider~d the front yard area. Therefore, a 30 <br />foot setback is required for the proposed off-street <br />parking area. However, the parking area is proposed to <br />only have a 15 foot setback. Therefore, a 15 foot <br />setback variance is required. <br />10 stalls (9 additional stalls through Proof of Parking) <br /> <br />4. Building Setbacks: <br />5. Parking Setbacks: <br />