Laserfiche WebLink
<br />PUBLIC WORKS <br /> <br />1. Streets: <br />2. Curb Cuts: <br />3. Utilities: <br /> <br />4. Easements: <br />5. Grading/Drainage: <br /> <br />6. RCWD: <br />7. Environmental Concerns: <br />8. MPCA: <br />9. Other Considerations: <br /> <br />BUILDING <br /> <br />1. Structure Size: <br />2. Structure Height: <br />3. Exterior Treatment: <br />4. USC Compliance: <br />5. Other Considerations: <br /> <br />SANIT A TION/HOUSING <br /> <br />1. <br />2. <br />3. <br />4. <br /> <br />Seating Requirements: <br />Kitchen Facilities: <br />Garbage/Rubbish Enclosures: <br />Other Considerations: <br /> <br />PARKS <br /> <br />Page 4 <br /> <br />None <br />One new curb cut <br />Existing water service to existing building would need to be <br />relocated to make room for proposed underground storage <br />tanks. <br />None <br />To be approved by City Engineer - crown in parking lot to be <br />cut and curbing added to divert stormwater to Old Highway 8. <br />Application to be made <br />None <br />NA <br />None <br /> <br />Canopy: 24' x 58' or 1,392 square feet <br />1 5 feet <br />Metal <br />To be determined <br />None <br /> <br />NA <br />NA <br />To be enclosed <br />None <br /> <br />1 . Impact on Parks: None <br />2. Impact on <br />Community Facilities: None <br />3. Other Considerations: None <br /> <br />FORESTRY <br /> <br />1. Tree Preservation: <br />2. Proposed Trees: <br />3. Other Considerations: <br /> <br />FIRE <br /> <br />1 . Access to Site: <br />2. Access to Structure: <br />3. Additional Hydrants: <br />4. Y Connection Location: <br />5. Other Considerations: <br /> <br />None <br />To be planted under Highway 8 greenway program <br />None <br /> <br />Adequate <br />Adequate <br />None <br />NA <br />None <br />